interconnection_net_costs_delta_present_future_annualised_costs debug
GQL Statement
SUM(
QUERY_FUTURE(interconnection_net_costs_delta_present_future_capex),
QUERY_FUTURE(interconnection_net_costs_delta_present_future_opex)
)
Result
2019 1.45 ms |
0.0
|
euro |
2050 0.01 ms |
0.0
|
euro |
Description
The delta (difference) between the present and the future costs of the interconnection net.
Characteristics
Groups | |
Unit | euro |
File path |
/app/tmp/etsource/gqueries/modules/network_calculation/interconnection_net/costs/interconnection_net_costs_delta_present_future_annualised_costs.gql
|
References
Gquery | interconnection_net_costs_future_annualised_costs |