GQL Statement
V(energy_power_hv_network_electricity,fixed_operation_and_maintenance_costs_per(:mw_input)) * QUERY_FUTURE(interconnection_net_capacity_delta_present_future)
Result
2019
0.76
ms
|
0.0
|
euro |
2050
0.04
ms
|
0.0
|
euro |
Description
The operations and maintenance costs of the future interconnection net, consisting of a fixed component only
Characteristics
Groups |
|
Unit |
euro |
File path |
/app/tmp/etsource/gqueries/modules/network_calculation/interconnection_net/costs/interconnection_net_costs_delta_present_future_fixed_operation_and_maintenance_costs.gql
|
References