GQL Statement
IF(
QUERY_FUTURE(lv_mv_trafo_extra_capacity_needed) > 0.0,
CEIL(DIVIDE(QUERY_FUTURE(lv_mv_trafo_extra_capacity_needed), AREA(lv_mv_trafo_capacity_per_step))),
0.0
)
Result
2019
235.19
ms
|
0.0
|
# |
2050
0.02
ms
|
0.0
|
# |
Description
The amount of capacity steps needed to built the future hv net. A capacity step is the extra capacity which will be built, when the net needs to be increased. The step size and costs is defined in the area files.
Characteristics
Groups |
|
Unit |
# |
File path |
/app/tmp/etsource/gqueries/modules/network_calculation/lv_mv_trafo/capacity/lv_mv_trafo_capacity_steps_built.gql
|
References