Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
agriculture_locally_available_electricity 0 Flexible
Reversed
42.0 %
4.5 %
Node MJ Type
agriculture_locally_available_steam_hot_water 0 Flexible
Reversed
53.5 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_national_gas_network_natural_gas
Edges 0 Outputs
Node MJ Type
agriculture_locally_available_electricity 0 Flexible
Reversed
42.0 %
4.5 %
Node MJ Type
agriculture_locally_available_steam_hot_water 0 Flexible
Reversed
53.5 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_national_gas_network_natural_gas

Details

Sector agriculture
Use energetic
Merit Order
group
weather/agriculture_heating
level
mv
subtype
must_run
type
producer
Network Gas
profile
weather/agriculture_heating
type
consumer
Node groups
  1. preset_demand
  2. electricity_production
  3. heat_production
  4. must_run_electricity_production
  5. wacc_proven_tech
  6. costs_production_chp_plants
  7. sankey_conversion_group
Used in Gqueries
  1. agriculture_chp_engine_must_run_network_gas
  2. agriculture_chp_engine_must_run_network_gas_capacity_in_chp_properties
  3. agriculture_chp_engine_must_run_network_gas_electricity_production_in_chp_properties
  4. agriculture_chp_engine_must_run_network_gas_heat_production_in_chp_properties
  5. agriculture_chp_engine_must_run_network_gas_number_of_units_in_chp_properties
  6. agriculture_supply_chp_engine_must_run_network_gas
  7. factsheet_supply_heat_from_rest_and_geothermal
  8. merit_order_agriculture_chp_gas_must_run_availability_in_merit_order_table
  9. merit_order_agriculture_chp_gas_must_run_capacity_in_merit_order_table
  10. merit_order_agriculture_chp_gas_must_run_full_load_hours_in_merit_order_table
  11. merit_order_agriculture_chp_gas_must_run_load_factor_in_merit_order_table
  12. merit_order_agriculture_chp_gas_must_run_operating_costs_in_merit_order_table
  13. merit_order_agriculture_chp_gas_must_run_position_in_merit_order_table
Used in Inputs
  1. capacity_of_agriculture_chp_engine_network_gas_must_run
  2. efficiency_agriculture_chp_engine_must_run_network_gas_electricity
  3. efficiency_agriculture_chp_engine_must_run_network_gas_heat
  4. investment_costs_combustion_gas_plant
  5. om_costs_combustion_gas_plant
Method Label Present Future Unit
technical
electricity_output_capacity * number_of_units Installed electrical capacity 0 0 MW
electricity_output_conversion Electrical efficiency 42.0 42.0 %
heat_output_conversion Heat efficiency 53.5 53.5 %
full_load_hours Full load hours 3,920 3,920 hour / year
cost
total_investment_over_lifetime_per(:mw_electricity) Investment over lifetime per MW 607902 607902 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_electricity) Fixed operation and maintenance costs 0 0 EUR / MW / year
variable_operation_and_maintenance_costs_per_full_load_hour Variable operation and maintenance costs 16 16 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 20 20 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 1.97 1.97 0% MWe
heat_output_capacity 2.51 2.51 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 1 1 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 3,920 3,920 0%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 20 20 0% year
typical_input_capacity 4.7 4.7 0% MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 1,200 K 1,200 K 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 0 0 euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 16 16 0% euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs 41.98 41.98 0% euro / MWh
max_consumption_price 41.98 41.98 0% euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0.95 0.95 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value - -
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand 0 0
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.004 0.004 0%
weighted_carrier_co2_per_mj 0.056 0.056 0%
sustainability_share 0.005 0.005 0%
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 4.7 4.7 0%
electric_based_input_capacity 4.7 4.7 0% MWinput
heat_based_input_capacity 4.7 4.7 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 410 K 410 K 0% euro / plant
fixed_costs_per(:plant) 85,200 85,200 0%
cost_of_capital_per(:plant) 25,200 25,200 0%
depreciation_costs_per(:plant) 60,000 60,000 0%
variable_costs_per(:plant) 325 K 325 K 0%
fuel_costs_per(:plant) 262 K 262 K 0%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 0 0
variable_operation_and_maintenance_costs_per(:plant) 62,720 62,720 0%
total_initial_investment_per(:plant) 1,200 K 1,200 K 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 208 K 208 K 0%
fixed_costs_per(:mw_electricity) 43,161.1 43,161.1 0%
cost_of_capital_per(:mw_electricity) 12,766 12,766 0%
depreciation_costs_per(:mw_electricity) 30,395.1 30,395.1 0%
variable_costs_per(:mw_electricity) 165 K 165 K 0%
fuel_costs_per(:mw_electricity) 133 K 133 K 0%
co2_emissions_costs_per(:mw_electricity) 0 0
captured_biogenic_co2_costs_per(:mw_electricity) 0 0
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) 31,773 31,773 0%
total_initial_investment_per(:mw_electricity) 608 K 608 K 0%
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 52.99 52.99 0%
fixed_costs_per(:mwh_electricity) 11.01 11.01 0%
cost_of_capital_per(:mwh_electricity) 3.26 3.26 0%
depreciation_costs_per(:mwh_electricity) 7.75 7.75 0%
variable_costs_per(:mwh_electricity) 41.98 41.98 0%
fuel_costs_per(:mwh_electricity) 33.87 33.87 0%
co2_emissions_costs_per(:mwh_electricity) 0 0
captured_biogenic_co2_costs_per(:mwh_electricity) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) 8.11 8.11 0%
total_initial_investment_per(:mwh_electricity) 155.1 155.1 0%
costs_per_mw_heat
total_costs_per(:mw_heat) 163 K 163 K 0%
fixed_costs_per(:mw_heat) 33,883.5 33,883.5 0%
cost_of_capital_per(:mw_heat) 10,021.9 10,021.9 0%
depreciation_costs_per(:mw_heat) 23,861.6 23,861.6 0%
variable_costs_per(:mw_heat) 129 K 129 K 0%
fuel_costs_per(:mw_heat) 104 K 104 K 0%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 0 0
variable_operation_and_maintenance_costs_per(:mw_heat) 24,943.3 24,943.3 0%
total_initial_investment_per(:mw_heat) 477 K 477 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 41.6 41.6 0%
fixed_costs_per(:mwh_heat) 8.64 8.64 0%
cost_of_capital_per(:mwh_heat) 2.56 2.56 0%
depreciation_costs_per(:mwh_heat) 6.09 6.09 0%
variable_costs_per(:mwh_heat) 32.96 32.96 0%
fuel_costs_per(:mwh_heat) 26.59 26.59 0%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 0 0
variable_operation_and_maintenance_costs_per(:mwh_heat) 6.36 6.36 0%
total_initial_investment_per(:mwh_heat) 121.7 121.7 0%