Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
buildings_useful_demand_after_insulation_cooling 0 Share
100.0 %
0.0 %
Inputs Edges 0
41.18 %
Type MJ Node
Share 0 environment_air_ambient_cold
58.82 %
Type MJ Node
Share 0 buildings_final_demand_for_cooling_network_gas
Edges 0 Outputs
Node MJ Type
buildings_useful_demand_after_insulation_cooling 0 Share
100.0 %
0.0 %
Inputs Edges 0
41.18 %
Type MJ Node
Share 0 environment_air_ambient_cold
58.82 %
Type MJ Node
Share 0 buildings_final_demand_for_cooling_network_gas

Details

Sector buildings
Use energetic
Network Gas
profile
buildings_cooling
type
consumer
Node groups
  1. heat_production
  2. application_group
  3. wacc_proven_tech
  4. costs_building_and_installations_buildings
Used in Gqueries
  1. buildings_cooling_heatpump_air_water_network_gas_cop
  2. buildings_cooling_heatpump_air_water_network_gas_input_of_electricity
  3. buildings_cooling_heatpump_air_water_network_gas_number_of_units
  4. total_cost_of_buildings_cooling_heatpump_air_water_network_gas
Used in Inputs
  1. buildings_cooling_heatpump_air_water_network_gas_share
  2. investment_costs_gas_heat_pumps
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 1.7 1.7 COP
heat_output_capacity Heat capacity per unit 2.25 2.25 MW / unit
full_load_hours Full load hours 4,000 4,000 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 2,479 K 2,479 K EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 99,296.2 99,296.2 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 2.25 2.25 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 4,000 4,000 0%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 2,479 K 2,479 K 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 99,296.2 99,296.2 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 0 0 0%
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0 0%
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.002 0.002 0%
weighted_carrier_co2_per_mj 0.033 0.033 0%
sustainability_share 0.414 0.414 0%
final_demand 0 0 0%
primary_demand 0 0 0%
primary_demand_of_fossil 0 0 0%
primary_demand_of_sustainable 0 0 0%
primary_demand_of_biogas 0 0 0%
primary_demand_of_lng 0 0 0%
primary_demand_of_natural_gas 0 0 0%
technical
input_capacity 2.25 2.25 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity - - MWinput
cooling_based_input_capacity 2.25 2.25 0% MWinput
number_of_units 0 0 0%
costs_per_plant
total_costs_per(:plant) 389 K 389 K 0% euro / plant
fixed_costs_per(:plant) 314 K 314 K 0%
cost_of_capital_per(:plant) 49,586 49,586 0%
depreciation_costs_per(:plant) 165 K 165 K 0%
variable_costs_per(:plant) 75,319.1 75,319.1 0%
fuel_costs_per(:plant) 75,319.1 75,319.1 0%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 99,296.2 99,296.2 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 2,479 K 2,479 K 0%
costs_per_node
total_costs_per(:node) 0 0 0%
fixed_costs_per(:node) 0 0 0%
cost_of_capital_per(:node) 0 0 0%
depreciation_costs_per(:node) 0 0 0%
variable_costs_per(:node) 0 0 0%
fuel_costs_per(:node) 0 0 0%
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0 0%
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0 0%
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 173 K 173 K 0%
fixed_costs_per(:mw_heat) 140 K 140 K 0%
cost_of_capital_per(:mw_heat) 22,038.2 22,038.2 0%
depreciation_costs_per(:mw_heat) 73,460.7 73,460.7 0%
variable_costs_per(:mw_heat) 33,475.2 33,475.2 0%
fuel_costs_per(:mw_heat) 33,475.2 33,475.2 0%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 44,131.7 44,131.7 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 1,102 K 1,102 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 43.28 43.28 0%
fixed_costs_per(:mwh_heat) 34.91 34.91 0%
cost_of_capital_per(:mwh_heat) 5.51 5.51 0%
depreciation_costs_per(:mwh_heat) 18.37 18.37 0%
variable_costs_per(:mwh_heat) 8.37 8.37 0%
fuel_costs_per(:mwh_heat) 8.37 8.37 0%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 11.03 11.03 0%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 275.5 275.5 0%