Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
energy_power_mv_distribution_network_electricity 0 Flexible
Reversed
18.3 %
34.7 %
Node MJ Type
energy_production_aggregator_mt_steam_hot_water 0 Flexible
Reversed
47.0 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_distribution_wood_pellets
Edges 0 Outputs
Node MJ Type
energy_power_mv_distribution_network_electricity 0 Flexible
Reversed
18.3 %
34.7 %
Node MJ Type
energy_production_aggregator_mt_steam_hot_water 0 Flexible
Reversed
47.0 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_distribution_wood_pellets

Details

Sector energy
Use energetic
Heat network (MT)
group
self: electricity_output_curve
subtype
must_run
type
producer
Merit Order
level
mv
subtype
dispatchable
type
producer
Node groups
  1. preset_demand
  2. electricity_production
  3. ccs_technology_pair
  4. heat_production
  5. dispatchable_production
  6. wacc_unproven_tech
  7. costs_production_chp_plants
  8. sankey_conversion_group
Used in Gqueries
  1. energy_biomass_total_in_co2_sankey
  2. energy_chp_local_mt_wood_pellets_ccs_dispatchable_capacity_in_chp_properties
  3. energy_chp_local_mt_wood_pellets_ccs_dispatchable_electricity_production_in_chp_properties
  4. energy_chp_local_mt_wood_pellets_ccs_dispatchable_heat_production_in_chp_properties
  5. energy_chp_local_mt_wood_pellets_ccs_dispatchable_number_of_units_in_chp_properties
  6. energy_chp_local_wood_pellets_ccs_dispatchable
  7. energy_chp_local_wood_pellets_mt_ccs_dispatchable_steam_hot_water_output_curve
  8. factsheet_demand_of_biomass_other
  9. factsheet_supply_heat_from_rest_and_geothermal
  10. merit_order_wood_pellets_chp_ccs_mt_dispatchable_availability_in_merit_order_table
  11. merit_order_wood_pellets_chp_ccs_mt_dispatchable_capacity_in_merit_order_table
  12. merit_order_wood_pellets_chp_ccs_mt_dispatchable_full_load_hours_in_merit_order_table
  13. merit_order_wood_pellets_chp_ccs_mt_dispatchable_load_factor_in_merit_order_table
  14. merit_order_wood_pellets_chp_ccs_mt_dispatchable_operating_costs_in_merit_order_table
  15. merit_order_wood_pellets_chp_ccs_mt_dispatchable_position_in_merit_order_table
Used in Inputs
  1. capacity_of_energy_chp_local_wood_pellets_dispatchable
  2. investment_costs_co2_ccs
  3. investment_costs_combustion_biomass_plants
  4. om_costs_co2_ccs
  5. om_costs_combustion_biomass_plant
  6. share_of_energy_chp_local_ht_wood_pellets_dispatchable
  7. share_of_energy_chp_local_mt_wood_pellets_ccs_dispatchable
  8. share_of_energy_chp_local_mt_wood_pellets_dispatchable
Method Label Present Future Unit
technical
electricity_output_capacity * number_of_units Installed electrical capacity 0 0 MW
electricity_output_conversion Electrical efficiency 18.3 18.3 %
full_load_hours Full load hours 8,500 0 hour / year
cost
initial_investment_per(:mw_electricity) + cost_of_installing_per(:mw_electricity) + decommissioning_costs_per(:mw_electricity) Investment over lifetime per MW 5685245 5685245 EUR / MW
ccs_investment_per(:mw_electricity) Additional initial investment for CCS 4364344 4364344 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_electricity) Fixed operation and maintenance costs 70069 70069 EUR / MW / year
variable_operation_and_maintenance_costs_per_full_load_hour Variable operation and maintenance costs (excl CCS) 0 0 EUR / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour Additional variable operation and maintenance costs for CCS 0 0 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 25 25 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 14.64 14.64 0% MWe
heat_output_capacity 37.6 37.6 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0.85 0.85 0%
ccs_capture_rate 0.85 0.85 0%
construction_time 2.5 2.5 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 8,500 0 -100%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 25 25 0% year
typical_input_capacity 80 80 0% MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 83.23 M 83.23 M 0% euro / unit
ccs_investment 63.89 M 63.89 M 0% euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 1,026 K 1,026 K 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs 32.84 32.84 0% euro / MWh
max_consumption_price 32.84 32.84 0% euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0.91 0.91 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value - -
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand 0 0
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.008 0.008 0%
weighted_carrier_co2_per_mj 0 0
sustainability_share 1 1 0%
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 80 80 0%
electric_based_input_capacity 80 80 0% MWinput
heat_based_input_capacity 80 80 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 24.73 M 10.15 M -58% euro / plant
fixed_costs_per(:plant) 10.15 M 10.15 M 0%
cost_of_capital_per(:plant) 3,237 K 3,237 K 0%
depreciation_costs_per(:plant) 5,885 K 5,885 K 0%
variable_costs_per(:plant) 14.58 M 0 -100%
fuel_costs_per(:plant) 20.37 M 0 -100%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) -5,787 K 0 -100%
fixed_operation_and_maintenance_costs_per(:plant) 1,026 K 1,026 K 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 147.13 M 147.13 M 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 1,689 K 693 K -58%
fixed_costs_per(:mw_electricity) 693 K 693 K 0%
cost_of_capital_per(:mw_electricity) 221 K 221 K 0%
depreciation_costs_per(:mw_electricity) 402 K 402 K 0%
variable_costs_per(:mw_electricity) 996 K 0 -100%
fuel_costs_per(:mw_electricity) 1,391 K 0 -100%
co2_emissions_costs_per(:mw_electricity) 0 0
captured_biogenic_co2_costs_per(:mw_electricity) -395 K 0 -100%
fixed_operation_and_maintenance_costs_per(:mw_electricity) 70,069.1 70,069.1 0%
variable_operation_and_maintenance_costs_per(:mw_electricity) 0 0
total_initial_investment_per(:mw_electricity) 10.05 M 10.05 M 0%
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 198.7 0 -100%
fixed_costs_per(:mwh_electricity) 81.55 0 -100%
cost_of_capital_per(:mwh_electricity) 26.01 0 -100%
depreciation_costs_per(:mwh_electricity) 47.29 0 -100%
variable_costs_per(:mwh_electricity) 117.2 NaN
fuel_costs_per(:mwh_electricity) 163.7 NaN
co2_emissions_costs_per(:mwh_electricity) 0 NaN
captured_biogenic_co2_costs_per(:mwh_electricity) -46.5 NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 8.24 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_electricity) 0 NaN
total_initial_investment_per(:mwh_electricity) 1,182.3 0 -100%
costs_per_mw_heat
total_costs_per(:mw_heat) 658 K 270 K -58%
fixed_costs_per(:mw_heat) 270 K 270 K 0%
cost_of_capital_per(:mw_heat) 86,084.4 86,084.4 0%
depreciation_costs_per(:mw_heat) 157 K 157 K 0%
variable_costs_per(:mw_heat) 388 K 0 -100%
fuel_costs_per(:mw_heat) 542 K 0 -100%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) -154 K 0 -100%
fixed_operation_and_maintenance_costs_per(:mw_heat) 27,282.2 27,282.2 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 3,913 K 3,913 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 77.38 0 -100%
fixed_costs_per(:mwh_heat) 31.75 0 -100%
cost_of_capital_per(:mwh_heat) 10.13 0 -100%
depreciation_costs_per(:mwh_heat) 18.41 0 -100%
variable_costs_per(:mwh_heat) 45.63 NaN
fuel_costs_per(:mwh_heat) 63.74 NaN
co2_emissions_costs_per(:mwh_heat) 0 NaN
captured_biogenic_co2_costs_per(:mwh_heat) -18.11 NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 3.21 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 NaN
total_initial_investment_per(:mwh_heat) 460.3 0 -100%