Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
energy_production_aggregator_mt_steam_hot_water 0 Flexible
Reversed
100.0 %
Inputs Edges 0
21.0 %
Type MJ Node
Share 0 energy_power_mv_distribution_network_electricity
79.0 %
Type MJ Node
Share 0 environment_earth_geothermal
Edges 0 Outputs
Node MJ Type
energy_production_aggregator_mt_steam_hot_water 0 Flexible
Reversed
100.0 %
Inputs Edges 0
21.0 %
Type MJ Node
Share 0 energy_power_mv_distribution_network_electricity
79.0 %
Type MJ Node
Share 0 environment_earth_geothermal

Details

Sector energy
Use energetic
Heat network (MT)
group
geothermal_heat
subtype
must_run
type
producer
Merit Order
group
self: steam_hot_water_output_curve
level
mv
subtype
generic
type
consumer
Node groups
  1. preset_demand
  2. heat_production
  3. central_production
  4. non_final_electricity_demand_converters
  5. wacc_proven_tech
  6. costs_production_heat_plants
  7. sankey_conversion_group
Used in Gqueries
  1. energy_heat_well_shallow_heatpump_geothermal_mt_steam_hot_water_output_curve
  2. factsheet_supply_heat_from_geothermal_collective
  3. factsheet_supply_heat_from_rest_and_geothermal
Used in Inputs
  1. capacity_of_energy_heat_well_shallow_heatpump_mt_geothermal
  2. investment_costs_geothermal
  3. om_costs_geothermal
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 4.76 4.76 COP
heat_output_capacity Heat capacity per unit 8.0 8.0 MW / unit
full_load_hours Full load hours 4,750 4,750 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 15.96 M 15.96 M EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 1,080 K 1,080 K EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 26.6 26.6 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 8 8 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 2 2 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 4,750 4,750 0%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 15.96 M 15.96 M 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 1,080 K 1,080 K 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 26.6 26.6 0% euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 1 1 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value - -
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand 0 0
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.001 0.001 -3%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.835 0.823 -1%
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 8 8 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity 8 8 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 2,721 K 2,719 K 0% euro / plant
fixed_costs_per(:plant) 2,506 K 2,506 K 0%
cost_of_capital_per(:plant) 362 K 362 K 0%
depreciation_costs_per(:plant) 1,064 K 1,064 K 0%
variable_costs_per(:plant) 216 K 213 K -1%
fuel_costs_per(:plant) 89,295.1 86,450.3 -3%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 1,080 K 1,080 K 0%
variable_operation_and_maintenance_costs_per(:plant) 126 K 126 K 0%
total_initial_investment_per(:plant) 15.96 M 15.96 M 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) 0 0
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 340 K 340 K 0%
fixed_costs_per(:mw_heat) 313 K 313 K 0%
cost_of_capital_per(:mw_heat) 45,220 45,220 0%
depreciation_costs_per(:mw_heat) 133 K 133 K 0%
variable_costs_per(:mw_heat) 26,955.6 26,600 -1%
fuel_costs_per(:mw_heat) 11,161.9 10,806.3 -3%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 135 K 135 K 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 15,793.8 15,793.8 0%
total_initial_investment_per(:mw_heat) 1,995 K 1,995 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 71.62 71.54 0%
fixed_costs_per(:mwh_heat) 65.94 65.94 0%
cost_of_capital_per(:mwh_heat) 9.52 9.52 0%
depreciation_costs_per(:mwh_heat) 28 28 0%
variable_costs_per(:mwh_heat) 5.67 5.6 -1%
fuel_costs_per(:mwh_heat) 2.35 2.28 -3%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 28.42 28.42 0%
variable_operation_and_maintenance_costs_per(:mwh_heat) 3.33 3.33 0%
total_initial_investment_per(:mwh_heat) 420 420 0%