Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
energy_hydrogen_transport_pipelines 0 Flexible
Reversed
69.4 %
30.6 %
Inputs Edges 0
0.0 %
100.0 %
Type MJ Node
Share 0 energy_distribution_lohc
Edges 0 Outputs
Node MJ Type
energy_hydrogen_transport_pipelines 0 Flexible
Reversed
69.4 %
30.6 %
Inputs Edges 0
0.0 %
100.0 %
Type MJ Node
Share 0 energy_distribution_lohc

Details

Sector energy
Use undefined
Hydrogen
group
flat
subtype
must_run
type
producer
Node groups
  1. hydrogen_production
  2. wacc_proven_tech
  3. costs_production_dedicated_hydrogen_production
  4. sankey_conversion_group
Used in Gqueries
  1. capacity_energy_hydrogen_lohc_reformer_for_h2_chart
  2. co2_intensity_of_hydrogen_production_lohc_reformer
  3. energy_hydrogen_lohc_reformer_h2_chart
  4. energy_hydrogen_lohc_reformer_hydrogen_output_curve
  5. energy_import_lohc_for_mekko
  6. lohc_reformer_in_source_of_hydrogen_production
  7. production_costs_per_mwh_hydrogen_by_lohc_reformer
Used in Inputs
  1. capacity_of_energy_hydrogen_lohc_reformer
Method Label Present Future Unit
technical
input_capacity * number_of_units Installed input capacity 0 0 MW
hydrogen_output_conversion Hydrogen output efficiency 69.4 69.4 %
full_load_hours Full load hours 4,690 4,690 hour / year
free_co2_factor CCS capture rate 0.0 0.0 %
cost
initial_investment_per(:mw_input_capacity) + cost_of_installing_per(:mw_input_capacity) + decommissioning_costs_per(:mw_input_capacity) Investment over lifetime per MW input 164437 164437 EUR / MW
ccs_investment_per(:mw_input_capacity) Additional initial investment for CCS 0 0 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_input_capacity) Fixed operation and maintenance costs 4110 4110 EUR / MW / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour Additional variable operation and maintenance costs for CCS 0 0 EUR / full load hour
wacc Weighted average cost of capital 7.0 7.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? true true boolean
other
technical_lifetime Technical lifetime 40 40 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0 0 MWth
hydrogen_output_capacity 857.1 857.1 0% MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 4,690 4,690 0%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 1 1 0% yes=1 / no=0
technical_lifetime 40 40 0% year
typical_input_capacity 1,235 1,235 0% MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 203.08 M 203.08 M 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 5,077 K 5,077 K 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.07 0.07 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 1 1 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 0 0
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.018 0.018 0%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0 0
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 1,235 1,235 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity - - MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 384.04 M 384.04 M 0% euro / plant
fixed_costs_per(:plant) 17.26 M 17.26 M 0%
cost_of_capital_per(:plant) 7,108 K 7,108 K 0%
depreciation_costs_per(:plant) 5,077 K 5,077 K 0%
variable_costs_per(:plant) 366.78 M 366.78 M 0%
fuel_costs_per(:plant) 366.78 M 366.78 M 0%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 5,077 K 5,077 K 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 203.08 M 203.08 M 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 0 0
fixed_costs_per(:mw_heat) 0 0
cost_of_capital_per(:mw_heat) 0 0
depreciation_costs_per(:mw_heat) 0 0
variable_costs_per(:mw_heat) 0 0
fuel_costs_per(:mw_heat) 0 0
co2_emissions_costs_per(:mw_heat) NaN NaN
captured_biogenic_co2_costs_per(:mw_heat) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_heat) 0 0
variable_operation_and_maintenance_costs_per(:mw_heat) NaN NaN
total_initial_investment_per(:mw_heat) 0 0
costs_per_mwh_heat
total_costs_per(:mwh_heat) 0 0
fixed_costs_per(:mwh_heat) 0 0
cost_of_capital_per(:mwh_heat) 0 0
depreciation_costs_per(:mwh_heat) 0 0
variable_costs_per(:mwh_heat) 0 0
fuel_costs_per(:mwh_heat) 0 0
co2_emissions_costs_per(:mwh_heat) NaN NaN
captured_biogenic_co2_costs_per(:mwh_heat) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 0 0
variable_operation_and_maintenance_costs_per(:mwh_heat) NaN NaN
total_initial_investment_per(:mwh_heat) 0 0