energy_hydrogen_steam_methane_reformer_must_run
Present
0
0
0
Future
0
0
0
|
|
|
|
Details
Sector | energy |
Use | undefined |
Hydrogen |
group
flat
subtype
must_run
type
producer
|
Network Gas |
demand_carrier
natural_gas
profile
flat
type
consumer
|
Node groups |
|
Used in Gqueries |
|
Used in Inputs |
Node Summary
Method | Label | Present | Future | Unit |
---|---|---|---|---|
technical | ||||
input_capacity * number_of_units | Installed input capacity | 0 | 0 | MW |
hydrogen_output_conversion | Hydrogen output efficiency | 81.3 | 81.3 | % |
full_load_hours | Full load hours | 8,322 | 8,322 | hour / year |
free_co2_factor | CCS capture rate | 0.0 | 0.0 | % |
cost | ||||
initial_investment_per(:mw_input_capacity) + cost_of_installing_per(:mw_input_capacity) + decommissioning_costs_per(:mw_input_capacity) | Investment over lifetime per MW input | 636229 | 636229 | EUR / MW |
ccs_investment_per(:mw_input_capacity) | Additional initial investment for CCS | 0 | 0 | EUR / MW |
fixed_operation_and_maintenance_costs_per(:mw_input_capacity) | Fixed operation and maintenance costs | 24390 | 24390 | EUR / MW / year |
variable_operation_and_maintenance_costs_per(:full_load_hour) | Variable operation and maintenance costs | 0 | 0 | EUR / full load hour |
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour | Additional variable operation and maintenance costs for CCS | 0 | 0 | EUR / full load hour |
wacc | Weighted average cost of capital | 4.0 | 4.0 | % |
takes_part_in_ets | Do emissions have to be paid through the ETS? | true | true | boolean |
other | ||||
technical_lifetime | Technical lifetime | 25 | 25 | years |
All Attributes
Node Attributes | Present | Future | Change | Unit |
---|---|---|---|---|
operational | ||||
electricity_output_capacity | 0 | 0 | MWe | |
heat_output_capacity | 0 | 0 | MWth | |
hydrogen_output_capacity | 300 | 300 | 0% | MW |
free_co2_factor | 0 | 0 | ||
ccs_capture_rate | - | - | ||
construction_time | 3 | 3 | 0% | |
electrical_efficiency_when_using_coal | - | - | ||
electrical_efficiency_when_using_wood_pellets | - | - | ||
full_load_hours | 8,322 | 8,322 | 0% | |
households_supplied_per_unit | - | - | ||
land_use_per_unit | - | - | ||
takes_part_in_ets | 1 | 1 | 0% | yes=1 / no=0 |
technical_lifetime | 25 | 25 | 0% | year |
typical_input_capacity | 369 | 369 | 0% | MWinput |
output_capacity | - | - | MW | |
input_efficiency | - | - | ||
output_efficiency | - | - | ||
cost | ||||
initial_investment | 222 M | 222 M | 0% | euro / unit |
ccs_investment | 0 | 0 | euro / unit | |
cost_of_installing | 0 | 0 | euro / unit | |
decommissioning_costs | 12.77 M | 12.77 M | 0% | euro / unit |
fixed_operation_and_maintenance_costs_per_year | 9,000 K | 9,000 K | 0% | euro / unit / year |
variable_operation_and_maintenance_costs_per_full_load_hour | 0 | 0 | euro / full load hour | |
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour | 0 | 0 | euro / full load hour | |
fixed_costs_per_mw_input_capacity | - | - | euro / MWinput | |
costs_per_mj | - | - | ||
wacc | 0.04 | 0.04 | 0% | |
profitability | - | - | profitable / unprofitable / conditionally_profitable | |
profit_per_mwh_electricity | - | - | eur/MWh | |
marginal_costs | - | - | euro / MWh | |
max_consumption_price | - | - | euro / MWh | |
merit_order | ||||
merit_order_full_load_hours | - | - | ||
merit_order_capacity_factor | - | - | ||
merit_order_position | - | - | ||
security_of_supply | ||||
availability | 1 | 1 | 0% | |
part_load_operating_point | - | - | ||
part_load_efficiency_penalty | - | - | ||
forecasting_error | - | - | ||
misc | ||||
demand_expected_value | 0 | 0 | ||
excel_id | - | - | ||
max_demand | - | - |