Present 371.38 M 371.38 M 371.38 M
Future 371.38 M 371.38 M 371.38 M
Edges 371.38 M Outputs
Node MJ Type
households_useful_demand_for_cooling 371.38 M Share
100.0 %
0.0 %
Inputs Edges 371.38 M
94.74 %
Type MJ Node
Share 351.83 M environment_earth_ambient_cold
5.26 %
Type MJ Node
Share 19.55 M households_final_demand_for_cooling_electricity
Edges 371.38 M Outputs
Node MJ Type
households_useful_demand_for_cooling 371.38 M Share
100.0 %
0.0 %
Inputs Edges 371.38 M
94.74 %
Type MJ Node
Share 351.83 M environment_earth_ambient_cold
5.26 %
Type MJ Node
Share 19.55 M households_final_demand_for_cooling_electricity

Details

Sector households
Use energetic
Merit Order
group
households_cooling
level
lv
subtype
generic
type
consumer
Node groups
  1. heat_production
  2. application_group
  3. lv_net_demand
  4. wacc_households
  5. costs_building_and_installations_households
Used in Gqueries
  1. households_cooling_heatpump_ground_water_electricity_cop
  2. households_cooling_heatpump_ground_water_electricity_input_of_electricity
  3. households_cooling_heatpump_ground_water_electricity_number_of_units
  4. lv_households_cooling_load_curve
  5. total_cost_of_households_cooling_heatpump_ground_water_electricity
Used in Inputs
  1. households_cooling_heatpump_ground_water_electricity_share
  2. investment_costs_electric_heat_pumps
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 19 19 COP
heat_output_capacity Heat capacity per unit 0.01 0.01 MW / unit
full_load_hours Full load hours 560 560 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 13,904 13,904 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 100 100 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 2.0 2.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0.01 0.01 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 560 560 0%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 13,904 13,904 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 100 100 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.02 0.02 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 371.38 M 371.38 M 0%
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 371.38 M 371.38 M 0%
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0 0 -3%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.963 0.96 0%
final_demand 19.55 M 19.55 M 0%
primary_demand 35.53 M 34.5 M -2%
primary_demand_of_fossil 1,314 K 1,370 K 4%
primary_demand_of_sustainable 34.21 M 33.13 M -3%
primary_demand_of_wood_pellets 1,249 K 0 -100%
primary_demand_of_biogas 182 K 201 K 10%
primary_demand_of_electricity 4,809 K 4,144 K -13%
primary_demand_of_coal 8,909 K 7,383 K -17%
primary_demand_of_lng 219 K 253 K 15%
primary_demand_of_natural_gas 14.84 M 17.15 M 15%
primary_demand_of_biogenic_waste 1,160 K 1,601 K 37%
primary_demand_of_non_biogenic_waste 1,029 K 1,419 K 37%
primary_demand_of_uranium_oxide 2,385 K 1,871 K -21%
primary_demand_of_imported_electricity 745 K 400 K -46%
technical
input_capacity 0.01 0.01 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity - - MWinput
cooling_based_input_capacity 0.01 0.01 0% MWinput
number_of_units 18,421.6 18,421.6 0%
costs_per_plant
total_costs_per(:plant) 1,168.9 1,168.8 0% euro / plant
fixed_costs_per(:plant) 1,166 1,166 0%
cost_of_capital_per(:plant) 139 139 0%
depreciation_costs_per(:plant) 926.9 926.9 0%
variable_costs_per(:plant) 2.95 2.86 -3%
fuel_costs_per(:plant) 2.95 2.86 -3%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 100 100 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 13,904 13,904 0%
costs_per_node
total_costs_per(:node) 21.53 M 21.53 M 0%
fixed_costs_per(:node) 21.48 M 21.48 M 0%
cost_of_capital_per(:node) 2,561 K 2,561 K 0%
depreciation_costs_per(:node) 17.08 M 17.08 M 0%
variable_costs_per(:node) 54,330.1 52,685.6 -3%
fuel_costs_per(:node) 54,330.1 52,685.6 -3%
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 1,842 K 1,842 K 0%
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 256.13 M 256.13 M 0%
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 117 K 117 K 0%
fixed_costs_per(:mw_heat) 117 K 117 K 0%
cost_of_capital_per(:mw_heat) 13,904 13,904 0%
depreciation_costs_per(:mw_heat) 92,693.3 92,693.3 0%
variable_costs_per(:mw_heat) 294.9 286 -3%
fuel_costs_per(:mw_heat) 294.9 286 -3%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 10,000 10,000 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 1,390 K 1,390 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 208.7 208.7 0%
fixed_costs_per(:mwh_heat) 208.2 208.2 0%
cost_of_capital_per(:mwh_heat) 24.83 24.83 0%
depreciation_costs_per(:mwh_heat) 165.5 165.5 0%
variable_costs_per(:mwh_heat) 0.527 0.511 -3%
fuel_costs_per(:mwh_heat) 0.527 0.511 -3%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 17.86 17.86 0%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 2,482.9 2,482.9 0%