Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
industry_locally_available_electricity 0 Flexible
Reversed
33.44 %
25.08 %
Node MJ Type
industry_locally_available_steam_hot_water 0 Flexible
Reversed
41.47 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_hydrogen_after_distribution
Edges 0 Outputs
Node MJ Type
industry_locally_available_electricity 0 Flexible
Reversed
33.44 %
25.08 %
Node MJ Type
industry_locally_available_steam_hot_water 0 Flexible
Reversed
41.47 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_hydrogen_after_distribution

Details

Sector industry
Use energetic
Hydrogen
group
self: electricity_output_curve
subtype
generic
type
consumer
Merit Order
level
mv
subtype
dispatchable
type
producer
Node groups
  1. preset_demand
  2. electricity_production
  3. dispatchable_production
  4. heat_production
  5. mv_net_supply
  6. wacc_proven_tech
  7. costs_production_chp_plants
  8. sankey_conversion_group
Used in Gqueries
  1. factsheet_supply_heat_from_rest_and_geothermal
  2. industry_chp_turbine_hydrogen
  3. industry_chp_turbine_hydrogen_capacity_in_chp_properties
  4. industry_chp_turbine_hydrogen_electricity_production_in_chp_properties
  5. industry_chp_turbine_hydrogen_heat_production_in_chp_properties
  6. industry_chp_turbine_hydrogen_in_industrial_heat_network_mekko
  7. industry_chp_turbine_hydrogen_number_of_units_in_chp_properties
  8. merit_order_industry_chp_hydrogen_turbine_availability_in_merit_order_table
  9. merit_order_industry_chp_hydrogen_turbine_capacity_in_merit_order_table
  10. merit_order_industry_chp_hydrogen_turbine_full_load_hours_in_merit_order_table
  11. merit_order_industry_chp_hydrogen_turbine_load_factor_in_merit_order_table
  12. merit_order_industry_chp_hydrogen_turbine_operating_costs_in_merit_order_table
  13. merit_order_industry_chp_hydrogen_turbine_position_in_merit_order_table
Used in Inputs
  1. capacity_of_industry_chp_turbine_hydrogen
  2. efficiency_industry_chp_turbine_hydrogen_electricity
  3. efficiency_industry_chp_turbine_hydrogen_heat
  4. external_coupling_capacity_of_industry_chp_turbine_hydrogen
  5. external_coupling_efficiency_industry_chp_turbine_hydrogen_electricity
  6. external_coupling_efficiency_industry_chp_turbine_hydrogen_heat
  7. investment_costs_combustion_hydrogen_plant
  8. om_costs_combustion_hydrogen_plant
Method Label Present Future Unit
technical
electricity_output_capacity * number_of_units Installed electrical capacity 0 0 MW
electricity_output_conversion Electrical efficiency 33.4 33.4 %
heat_output_conversion Heat efficiency 41.5 41.5 %
full_load_hours Full load hours 8,300 0 hour / year
cost
total_investment_over_lifetime_per(:mw_electricity) Investment over lifetime per MW 600000 600000 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_electricity) Fixed operation and maintenance costs 60000 60000 EUR / MW / year
variable_operation_and_maintenance_costs_per_full_load_hour Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 7.0 7.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? true true boolean
other
technical_lifetime Technical lifetime 25 25 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 20 20 0% MWe
heat_output_capacity 24.8 24.8 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 1.5 1.5 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 8,300 0 -100%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 1 1 0% yes=1 / no=0
technical_lifetime 25 25 0% year
typical_input_capacity 59.8 59.8 0% MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 12 M 12 M 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 1,200 K 1,200 K 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.07 0.07 0%
profitability - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs 179.9 179.9 0% euro / MWh
max_consumption_price 179.9 179.9 0% euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0.9 0.9 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value - -
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand 0 0
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.017 0.017 0%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0 0
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 59.8 59.8 0%
electric_based_input_capacity 59.8 59.8 0% MWinput
heat_based_input_capacity 59.8 59.8 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 31.99 M 2,125 K -93% euro / plant
fixed_costs_per(:plant) 2,125 K 2,125 K 0%
cost_of_capital_per(:plant) 445 K 445 K 0%
depreciation_costs_per(:plant) 480 K 480 K 0%
variable_costs_per(:plant) 29.86 M 0 -100%
fuel_costs_per(:plant) 29.86 M 0 -100%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 1,200 K 1,200 K 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 12 M 12 M 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 1,599 K 106 K -93%
fixed_costs_per(:mw_electricity) 106 K 106 K 0%
cost_of_capital_per(:mw_electricity) 22,260 22,260 0%
depreciation_costs_per(:mw_electricity) 24,000 24,000 0%
variable_costs_per(:mw_electricity) 1,493 K 0 -100%
fuel_costs_per(:mw_electricity) 1,493 K 0 -100%
co2_emissions_costs_per(:mw_electricity) 0 0
captured_biogenic_co2_costs_per(:mw_electricity) 0 0
fixed_operation_and_maintenance_costs_per(:mw_electricity) 60,000 60,000 0%
variable_operation_and_maintenance_costs_per(:mw_electricity) 0 0
total_initial_investment_per(:mw_electricity) 600 K 600 K 0%
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 192.7 0 -100%
fixed_costs_per(:mwh_electricity) 12.8 0 -100%
cost_of_capital_per(:mwh_electricity) 2.68 0 -100%
depreciation_costs_per(:mwh_electricity) 2.89 0 -100%
variable_costs_per(:mwh_electricity) 179.9 NaN
fuel_costs_per(:mwh_electricity) 179.9 NaN
co2_emissions_costs_per(:mwh_electricity) 0 NaN
captured_biogenic_co2_costs_per(:mwh_electricity) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 7.23 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_electricity) 0 NaN
total_initial_investment_per(:mwh_electricity) 72.29 0 -100%
costs_per_mw_heat
total_costs_per(:mw_heat) 1,290 K 85,693.5 -93%
fixed_costs_per(:mw_heat) 85,693.5 85,693.5 0%
cost_of_capital_per(:mw_heat) 17,951.6 17,951.6 0%
depreciation_costs_per(:mw_heat) 19,354.8 19,354.8 0%
variable_costs_per(:mw_heat) 1,204 K 0 -100%
fuel_costs_per(:mw_heat) 1,204 K 0 -100%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 48,387.1 48,387.1 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 484 K 484 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 155.4 0 -100%
fixed_costs_per(:mwh_heat) 10.32 0 -100%
cost_of_capital_per(:mwh_heat) 2.16 0 -100%
depreciation_costs_per(:mwh_heat) 2.33 0 -100%
variable_costs_per(:mwh_heat) 145.1 NaN
fuel_costs_per(:mwh_heat) 145.1 NaN
co2_emissions_costs_per(:mwh_heat) 0 NaN
captured_biogenic_co2_costs_per(:mwh_heat) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 5.83 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 NaN
total_initial_investment_per(:mwh_heat) 58.3 0 -100%