technical |
input_capacity * number_of_units |
Installed capacity |
0
|
0
|
MWe |
kerosene_output_conversion |
Kerosene output efficiency |
0.0
|
0.0
|
% |
full_load_hours |
Full load hours |
8,000
|
8,000
|
hour / year |
cost |
total_investment_over_lifetime_per(:mw_input_capacity) |
Investment over lifetime per MW input |
1546
|
1546
|
EUR / MW |
fixed_operation_and_maintenance_costs_per(:mw_input_capacity) |
Fixed operation and maintenance costs |
46
|
46
|
EUR / MW / year |
variable_operation_and_maintenance_costs_per_full_load_hour |
Variable operation and maintenance costs |
3627
|
3627
|
EUR / full load hour |
wacc |
Weighted average cost of capital |
7.0
|
7.0
|
% |
takes_part_in_ets |
Do emissions have to be paid through the ETS? |
false
|
false
|
boolean |
other |
technical_lifetime |
Technical lifetime |
15
|
15
|
years |