Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node kg Type
industry_steel_captured_co2 0 Share
Reversed
Co2
100.0 %
Inputs Edges 0
Co2
100.0 %
Type kg Node
Share
Reversed
0 industry_steel_external_coupling_node_capture_potential_co2
Edges 0 Outputs
Node kg Type
industry_steel_captured_co2 0 Share
Reversed
Co2
100.0 %
Inputs Edges 0
Co2
100.0 %
Type kg Node
Share
Reversed
0 industry_steel_external_coupling_node_capture_potential_co2

Details

Sector industry
Use
Node groups
  1. costs_co2_ccus
  2. wacc_unproven_tech
Used in Gqueries
Used in Inputs
  1. external_coupling_industry_metal_steel_ccus_captured_co2
  2. share_of_industry_steel_captured_co2
Method Label Present Future Unit
technical
input_capacity * full_load_hours * number_of_units Total installed capture capacity 0 0 T_CO2 / year
input_capacity * full_load_hours Capture capacity per unit 4972524 4972524 T_CO2 / year
full_load_hours Full load hours 8,000 8,000 hour / year
cost
total_initial_investment_per(:plant) Initial investment 570.36 M 570.36 M EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 26.52 M 26.52 M EUR / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour Variable operation and maintenance costs 5768 5768 EUR / full load hour
wacc Weighted average cost of capital 7.0 7.0 %
other
technical_lifetime Economic lifetime 15 15 years