GQL Statement
buildings_peak_demand_in_kw = Q(buildings_district_heating_mt_demand_peak) * 1000.0;
buildings_with_district_heating = Q(number_of_buildings) * DIVIDE(INPUT_VALUE(buildings_space_heater_district_heating_mt_steam_hot_water_share),100.0);
buildings_peak_demand_in_kw * AREA(heat_buildings_indoor_investment_costs_eur_per_kw) + buildings_with_district_heating * AREA(heat_buildings_indoor_investment_costs_eur_per_connection)
Result
2019
1.47
ms
|
0.0
|
euro |
2050
3.2
ms
|
0.0
|
euro |
Description
Buildings have two cost components:
costs per connection (indoor and outdoor construction costs, and fixed costs for the heat delivery set and heat meter)
and costs depending on demand (indoor distribution costs and variable costs for the heat meter)
Characteristics
Groups |
|
Unit |
euro |
File path |
/app/tmp/etsource/gqueries/general/costs/heat_infrastructure/mt/indoor_annualised_costs/support_queries/heat_infrastructure_buildings_mt_indoor_investment_costs.gql
|
References