GQL Statement

V(energy_power_hv_network_electricity,wacc)

Result

2019 0.11 ms
0.03
euro
2050 0.02 ms
0.03
euro

Description

This query retrieves the WACC used in calculating the capital costs. The query is used in the ETM costs export.

Characteristics

Groups
Unit euro
File path /app/tmp/etsource/gqueries/modules/network_calculation/interconnection_net/costs/interconnection_net_costs_delta_present_future_wacc.gql

References

Gquery interconnection_net_costs_delta_present_future_capital_costs