QUERY_FUTURE(mv_hv_trafo_peak_load_future) - QUERY_PRESENT(mv_hv_trafo_capacity_present)
Result
| 2019 |
-9,182.642285492202
|
MW |
| 2050 |
-9,182.642285492202
|
MW |
Description
The extra needed capacity is the delta (difference) between the present capacity of the net and the peak load in the future scenario. The difference is the extra needed capacity.
Characteristics
| Groups | |
| Unit | MW |
| File path |
/app/tmp/etsource/gqueries/modules/network_calculation/mv_hv_trafo/capacity/mv_hv_trafo_extra_capacity_needed.gql
|
References
| Gquery | mv_hv_trafo_capacity_steps_built |