GQL Statement
V(energy_power_hv_network_electricity,fixed_operation_and_maintenance_costs_per(:mw_input)) * QUERY_FUTURE(interconnection_net_capacity_delta_present_future)
Result
| 2019 | 0.0 | euro | 
| 2050 | 0.0 | euro | 
Description
The operations and maintenance costs of the future interconnection net, consisting of a fixed component only
 
Characteristics
| Groups |  | 
| Unit | euro | 
| File path | /app/tmp/etsource/gqueries/modules/network_calculation/interconnection_net/costs/interconnection_net_costs_delta_present_future_fixed_operation_and_maintenance_costs.gql | 
References