Present 129.21 B 121.1 B 121.1 B
Future 129.21 B 121.1 B 121.1 B
Edges 129.21 B Outputs
0.0 %
Node MJ Type
buildings_space_heater_network_gas_aggregator 129.21 B Share
106.7 %
Inputs Edges 121.1 B
100.0 %
Type MJ Node
Share 121.1 B buildings_final_demand_for_space_heating_network_gas
Edges 129.21 B Outputs
0.0 %
Node MJ Type
buildings_space_heater_network_gas_aggregator 129.21 B Share
106.7 %
Inputs Edges 121.1 B
100.0 %
Type MJ Node
Share 121.1 B buildings_final_demand_for_space_heating_network_gas

Details

Sector buildings
Use energetic
Fever (Heat)
defer_for
4
group
buildings_space_heating
share_in_group
0.825668489453748
technology_curve_type
tech_day_night
type
producer
Network Gas
profile
self: heat_output_curve
type
consumer
Node groups
  1. demand_driven
  2. heat_production
  3. application_group
  4. aggregator_producer
  5. wacc_proven_tech
  6. costs_building_and_installations_buildings
  7. ht_delivery_system_buildings
Used in Gqueries
  1. buildings_space_heater_network_gas_delta_in_investment_cost_table
  2. buildings_space_heater_network_gas_future_in_investment_cost_table
  3. buildings_space_heater_network_gas_present_in_investment_cost_table
  4. depreciation_costs_buildings_gas_burner_per_kw
  5. total_cost_of_buildings_space_heater_network_gas
  6. turk_number_of_units_of_buildings_space_heater_network_gas
Used in Inputs
  1. buildings_space_heater_network_gas_share
  2. efficiency_buildings_space_heater_network_gas
Method Label Present Future Unit
technical
heat_output_conversion Heat efficiency (LHV) 106.7 106.7 %
heat_output_capacity Heat capacity per unit 0.043 0.043 MW / unit
full_load_hours Full load hours 1,107.9 1,107.9 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 2,000 2,000 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 130 130 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 00{class: "change"}MWe
heat_output_capacity 0.0430.043{class: "change"}MWth
hydrogen_output_capacity 00{class: "change"}MW
free_co2_factor 00{class: "change"}
ccs_capture_rate --{class: "change"}
construction_time 00{class: "change"}
electrical_efficiency_when_using_coal --{class: "change"}
electrical_efficiency_when_using_wood_pellets --{class: "change"}
full_load_hours 1,107.91,107.9{class: "change"}
households_supplied_per_unit 11{class: "change"}
land_use_per_unit --{class: "change"}
takes_part_in_ets 00{class: "change"}yes=1 / no=0
technical_lifetime 1515{class: "change"}year
typical_input_capacity --{class: "change"}MWinput
output_capacity --{class: "change"}MW
input_efficiency --{class: "change"}
output_efficiency --{class: "change"}
cost
initial_investment 2,0002,000{class: "change"}euro / unit
ccs_investment 00{class: "change"}euro / unit
cost_of_installing 00{class: "change"}euro / unit
decommissioning_costs 00{class: "change"}euro / unit
fixed_operation_and_maintenance_costs_per_year 130130{class: "change"}euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 00{class: "change"}euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 00{class: "change"}euro / full load hour
fixed_costs_per_mw_input_capacity --{class: "change"}euro / MWinput
costs_per_mj --{class: "change"}
wacc 0.040.04{class: "change"}
profitability --{class: "change"}profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity --{class: "change"}eur/MWh
marginal_costs --{class: "change"}euro / MWh
max_consumption_price --{class: "change"}euro / MWh
capital_expenditures 173.3173.3{class: "change"}euro / unit / year
operating_expenses 130130{class: "change"}euro / unit / year
operating_expenses_including_fuel 765.2765.2{class: "change"}euro / unit / year
revenue 00{class: "change"}euro / unit / year
merit_order
merit_order_full_load_hours --{class: "change"}
merit_order_capacity_factor --{class: "change"}
merit_order_position --{class: "change"}
security_of_supply
availability 00{class: "change"}
part_load_operating_point --{class: "change"}
part_load_efficiency_penalty --{class: "change"}
forecasting_error --{class: "change"}
misc
demand_expected_value 121.1 B121.1 B{class: "change"}
excel_id --{class: "change"}
max_demand --{class: "change"}
Node Calculations Present Future Change Unit
demand
demand 121.1 B121.1 B{class: "change"}
preset_demand --{class: "change"}
demand_of_sustainable 00{class: "change"}
weighted_carrier_cost_per_mj 0.0040.004{class: "change"}
weighted_carrier_co2_per_mj 0.0560.056{class: "change"}
sustainability_share 0.0050.005{class: "change"}
primary_demand 122.86 B122.71 B{class: "change"}
primary_demand_of_fossil 122.3 B122.15 B{class: "change"}
primary_demand_of_sustainable 562.49 M561.82 M{class: "change"}
primary_demand_of_lng 1.78 B1.78 B{class: "change"}
primary_demand_of_wet_biomass 1.03 B1.03 B{class: "change"}
primary_demand_of_natural_gas 120.05 B119.9 B{class: "change"}
technical
input_capacity 0.040.04{class: "change"}
electric_based_input_capacity --{class: "change"}MWinput
heat_based_input_capacity 0.040.04{class: "change"}MWinput
cooling_based_input_capacity --{class: "change"}MWinput
number_of_units 753 K753 K{class: "change"}
costs_per_plant
total_costs_per(:plant) 938.5938.5{class: "change"}euro / plant
fixed_costs_per(:plant) 303.3303.3{class: "change"}
cost_of_capital_per(:plant) 4040{class: "change"}
depreciation_costs_per(:plant) 133.3133.3{class: "change"}
variable_costs_per(:plant) 635.2635.2{class: "change"}
fuel_costs_per(:plant) 635.2635.2{class: "change"}
co2_emissions_costs_per(:plant) 00{class: "change"}
captured_biogenic_co2_costs_per(:plant) 00{class: "change"}
fixed_operation_and_maintenance_costs_per(:plant) 130130{class: "change"}
variable_operation_and_maintenance_costs_per(:plant) 00{class: "change"}
total_initial_investment_per(:plant) 2,0002,000{class: "change"}
costs_per_node
total_costs_per(:node) 707.1 M707.1 M{class: "change"}
fixed_costs_per(:node) 228.54 M228.54 M{class: "change"}
cost_of_capital_per(:node) 30.14 M30.14 M{class: "change"}
depreciation_costs_per(:node) 100.46 M100.46 M{class: "change"}
variable_costs_per(:node) 478.56 M478.56 M{class: "change"}
fuel_costs_per(:node) 478.56 M478.56 M{class: "change"}
co2_emissions_costs_per(:node) 00{class: "change"}
captured_biogenic_co2_costs_per(:node) 00{class: "change"}
fixed_operation_and_maintenance_costs_per(:node) 97.94 M97.94 M{class: "change"}
variable_operation_and_maintenance_costs_per(:node) 00{class: "change"}
total_initial_investment_per(:node) 1.51 B1.51 B{class: "change"}
costs_per_mw_electricity
total_costs_per(:mw_electricity) 00{class: "change"}
fixed_costs_per(:mw_electricity) 00{class: "change"}
cost_of_capital_per(:mw_electricity) 00{class: "change"}
depreciation_costs_per(:mw_electricity) 00{class: "change"}
variable_costs_per(:mw_electricity) 00{class: "change"}
fuel_costs_per(:mw_electricity) 00{class: "change"}
co2_emissions_costs_per(:mw_electricity) NaNNaN{class: "change"}
captured_biogenic_co2_costs_per(:mw_electricity) NaNNaN{class: "change"}
fixed_operation_and_maintenance_costs_per(:mw_electricity) 00{class: "change"}
variable_operation_and_maintenance_costs_per(:mw_electricity) NaNNaN{class: "change"}
total_initial_investment_per(:mw_electricity) 00{class: "change"}
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 00{class: "change"}
fixed_costs_per(:mwh_electricity) 00{class: "change"}
cost_of_capital_per(:mwh_electricity) 00{class: "change"}
depreciation_costs_per(:mwh_electricity) 00{class: "change"}
variable_costs_per(:mwh_electricity) 00{class: "change"}
fuel_costs_per(:mwh_electricity) 00{class: "change"}
co2_emissions_costs_per(:mwh_electricity) NaNNaN{class: "change"}
captured_biogenic_co2_costs_per(:mwh_electricity) NaNNaN{class: "change"}
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 00{class: "change"}
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaNNaN{class: "change"}
total_initial_investment_per(:mwh_electricity) 00{class: "change"}
costs_per_mw_heat
total_costs_per(:mw_heat) 21,826.121,826.1{class: "change"}
fixed_costs_per(:mw_heat) 7,054.37,054.3{class: "change"}
cost_of_capital_per(:mw_heat) 930.2930.2{class: "change"}
depreciation_costs_per(:mw_heat) 3,100.83,100.8{class: "change"}
variable_costs_per(:mw_heat) 14,771.814,771.8{class: "change"}
fuel_costs_per(:mw_heat) 14,771.814,771.8{class: "change"}
co2_emissions_costs_per(:mw_heat) 00{class: "change"}
captured_biogenic_co2_costs_per(:mw_heat) 00{class: "change"}
fixed_operation_and_maintenance_costs_per(:mw_heat) 3,023.33,023.3{class: "change"}
variable_operation_and_maintenance_costs_per(:mw_heat) 00{class: "change"}
total_initial_investment_per(:mw_heat) 46,511.646,511.6{class: "change"}
costs_per_mwh_heat
total_costs_per(:mwh_heat) 19.719.7{class: "change"}
fixed_costs_per(:mwh_heat) 6.376.37{class: "change"}
cost_of_capital_per(:mwh_heat) 0.840.84{class: "change"}
depreciation_costs_per(:mwh_heat) 2.82.8{class: "change"}
variable_costs_per(:mwh_heat) 13.3313.33{class: "change"}
fuel_costs_per(:mwh_heat) 13.3313.33{class: "change"}
co2_emissions_costs_per(:mwh_heat) 00{class: "change"}
captured_biogenic_co2_costs_per(:mwh_heat) 00{class: "change"}
fixed_operation_and_maintenance_costs_per(:mwh_heat) 2.732.73{class: "change"}
variable_operation_and_maintenance_costs_per(:mwh_heat) 00{class: "change"}
total_initial_investment_per(:mwh_heat) 41.9841.98{class: "change"}