Present 0 0 0
Future 0 0 0
Edges 0 Outputs
0.0 %
0.0 %
Node MJ Type
buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity_aggregator 0 Share
101.63 %
Inputs Edges 0
63.2 %
Type MJ Node
Share 0 environment_air_ambient_heat
18.06 %
Type MJ Node
Share 0 buildings_final_demand_for_space_heating_electricity
18.74 %
Type MJ Node
Share 0 buildings_final_demand_for_space_heating_hydrogen
Edges 0 Outputs
0.0 %
0.0 %
Node MJ Type
buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity_aggregator 0 Share
100.0 %
Inputs Edges 0
63.2 %
Type MJ Node
Share 0 environment_air_ambient_heat
18.06 %
Type MJ Node
Share 0 buildings_final_demand_for_space_heating_electricity
18.74 %
Type MJ Node
Share 0 buildings_final_demand_for_space_heating_hydrogen

Details

Sector buildings
Use energetic
Fever (Heat)
base_cop
2.323
capacity
electricity: 0.0018327326043130307 hydrogen: 0.022
cop_cutoff
2.6
cop_per_degree
0.0578
defer_for
4
efficiency_balanced_with
ambient_heat
efficiency_based_on
electricity
group
buildings_space_heating
share_in_group
0.0
technology_curve_type
tech_constant
type
producer
Hydrogen
group
self: useable_heat_output_curve
subtype
generic
type
consumer
Node groups
  1. cost_heat_pumps
  2. demand_driven
  3. heat_production
  4. application_group
  5. aggregator_producer
  6. lv_net_demand
  7. wacc_proven_tech
  8. merit_order_csv_include
  9. mt_delivery_system_buildings
  10. costs_building_and_installations_buildings
Used in Gqueries
  1. buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity_base_cop
  2. buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity_cop
  3. buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity_cop_per_degree
  4. buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity_input_of_electricity
  5. buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity_number_of_units
  6. buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity_output_of_useable_heat
Used in Inputs
  1. buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity_share
  2. efficiency_buildings_space_heater_hybrid_hydrogen_heatpump_air_water_electricity
  3. flexibility_heat_pump_space_heating_cop_cutoff_gas
  4. investment_costs_electric_heat_pumps
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 4.5 4.5 COP
heat_output_capacity Heat capacity per unit 0.005 0.005 MW / unit
full_load_hours Full load hours 0 0 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 6,500 6,500 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 200 200 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs NaN NaN EUR / full load hour
wacc Weighted average cost of capital 2.0 2.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0.005 0.005 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 0 0
households_supplied_per_unit 1 1 0%
land_use_per_unit - -
takes_part_in_ets - - yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 5,500 5,500 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 1,000 1,000 0% euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 200 200 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.02 0.02 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 0 0
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.004 0.004 0%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.657 0.652 0%
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 0.005 0.005 1%
electric_based_input_capacity - - MWinput
heat_based_input_capacity 0.005 0.005 1% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 698.3 698.3 0% euro / plant
fixed_costs_per(:plant) 698.3 698.3 0%
cost_of_capital_per(:plant) 65 65 0%
depreciation_costs_per(:plant) 433.3 433.3 0%
variable_costs_per(:plant) 0 0
fuel_costs_per(:plant) 0 0
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 200 200 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 6,500 6,500 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) NaN NaN
fuel_costs_per(:mw_electricity) NaN NaN
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) NaN NaN
fuel_costs_per(:mwh_electricity) NaN NaN
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 143 K 143 K 0%
fixed_costs_per(:mw_heat) 143 K 143 K 0%
cost_of_capital_per(:mw_heat) 13,265.3 13,265.3 0%
depreciation_costs_per(:mw_heat) 88,435.4 88,435.4 0%
variable_costs_per(:mw_heat) 0 0
fuel_costs_per(:mw_heat) 0 0
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 40,816.3 40,816.3 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 1,327 K 1,327 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 0 0
fixed_costs_per(:mwh_heat) 0 0
cost_of_capital_per(:mwh_heat) 0 0
depreciation_costs_per(:mwh_heat) 0 0
variable_costs_per(:mwh_heat) NaN NaN
fuel_costs_per(:mwh_heat) NaN NaN
co2_emissions_costs_per(:mwh_heat) NaN NaN
captured_biogenic_co2_costs_per(:mwh_heat) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 0 0
variable_operation_and_maintenance_costs_per(:mwh_heat) NaN NaN
total_initial_investment_per(:mwh_heat) 0 0