Present 129.35 B 121.22 B 121.22 B
Future 129.35 B 121.22 B 121.22 B
Edges 129.35 B Outputs
0.0 %
Node MJ Type
buildings_space_heater_network_gas_aggregator 129.35 B Share
106.7 %
Inputs Edges 121.22 B
100.0 %
Type MJ Node
Share 121.22 B buildings_final_demand_for_space_heating_network_gas
Edges 129.35 B Outputs
0.0 %
Node MJ Type
buildings_space_heater_network_gas_aggregator 129.35 B Share
106.7 %
Inputs Edges 121.22 B
100.0 %
Type MJ Node
Share 121.22 B buildings_final_demand_for_space_heating_network_gas

Details

Sector buildings
Use energetic
Fever (Heat)
defer_for
4
group
buildings_space_heating
share_in_group
0.8833336738088178
technology_curve_type
tech_day_night
type
producer
Network Gas
profile
self: heat_output_curve
type
consumer
Node groups
  1. demand_driven
  2. heat_production
  3. application_group
  4. aggregator_producer
  5. wacc_proven_tech
  6. costs_building_and_installations_buildings
  7. ht_delivery_system_buildings
Used in Gqueries
  1. buildings_space_heater_network_gas_delta_in_investment_cost_table
  2. buildings_space_heater_network_gas_future_in_investment_cost_table
  3. buildings_space_heater_network_gas_present_in_investment_cost_table
  4. depreciation_costs_buildings_gas_burner_per_kw
  5. total_cost_of_buildings_space_heater_network_gas
  6. turk_number_of_units_of_buildings_space_heater_network_gas
Used in Inputs
  1. buildings_space_heater_network_gas_share
  2. efficiency_buildings_space_heater_network_gas
Method Label Present Future Unit
technical
heat_output_conversion Heat efficiency (LHV) 106.7 106.7 %
heat_output_capacity Heat capacity per unit 0.043 0.043 MW / unit
full_load_hours Full load hours 2,410.9 2,410.9 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 2,000 2,000 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 130 130 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 00{:class=>"change"}MWe
heat_output_capacity 0.0430.043{:class=>"change"}MWth
hydrogen_output_capacity 00{:class=>"change"}MW
free_co2_factor 00{:class=>"change"}
ccs_capture_rate --{:class=>"change"}
construction_time 00{:class=>"change"}
electrical_efficiency_when_using_coal --{:class=>"change"}
electrical_efficiency_when_using_wood_pellets --{:class=>"change"}
full_load_hours 2,410.92,410.9{:class=>"change"}
households_supplied_per_unit 11{:class=>"change"}
land_use_per_unit --{:class=>"change"}
takes_part_in_ets 00{:class=>"change"}yes=1 / no=0
technical_lifetime 1515{:class=>"change"}year
typical_input_capacity --{:class=>"change"}MWinput
output_capacity --{:class=>"change"}MW
input_efficiency --{:class=>"change"}
output_efficiency --{:class=>"change"}
cost
initial_investment 2,0002,000{:class=>"change"}euro / unit
ccs_investment 00{:class=>"change"}euro / unit
cost_of_installing 00{:class=>"change"}euro / unit
decommissioning_costs 00{:class=>"change"}euro / unit
fixed_operation_and_maintenance_costs_per_year 130130{:class=>"change"}euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 00{:class=>"change"}euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 00{:class=>"change"}euro / full load hour
fixed_costs_per_mw_input_capacity --{:class=>"change"}euro / MWinput
costs_per_mj --{:class=>"change"}
wacc 0.040.04{:class=>"change"}
profitability --{:class=>"change"}profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity --{:class=>"change"}eur/MWh
marginal_costs --{:class=>"change"}euro / MWh
max_consumption_price --{:class=>"change"}euro / MWh
merit_order
merit_order_full_load_hours --{:class=>"change"}
merit_order_capacity_factor --{:class=>"change"}
merit_order_position --{:class=>"change"}
security_of_supply
availability 00{:class=>"change"}
part_load_operating_point --{:class=>"change"}
part_load_efficiency_penalty --{:class=>"change"}
forecasting_error --{:class=>"change"}
misc
demand_expected_value 121.22 B121.22 B{:class=>"change"}
excel_id --{:class=>"change"}
max_demand --{:class=>"change"}
Node Calculations Present Future Change Unit
demand
demand 121.22 B121.22 B{:class=>"change"}
preset_demand --{:class=>"change"}
demand_of_sustainable 00{:class=>"change"}
weighted_carrier_cost_per_mj 0.0050.005{:class=>"change"}
weighted_carrier_co2_per_mj 0.0560.056{:class=>"change"}
sustainability_share 0.0030.003{:class=>"change"}
final_demand 121.22 B121.22 B{:class=>"change"}
primary_demand 123.07 B123.07 B{:class=>"change"}
primary_demand_of_fossil 122.64 B122.64 B{:class=>"change"}
primary_demand_of_sustainable 429.28 M429.28 M{:class=>"change"}
primary_demand_of_biogas 425.41 M425.41 M{:class=>"change"}
primary_demand_of_lng 2.08 B2.08 B{:class=>"change"}
primary_demand_of_natural_gas 120.57 B120.57 B{:class=>"change"}
technical
input_capacity 0.040.04{:class=>"change"}
electric_based_input_capacity --{:class=>"change"}MWinput
heat_based_input_capacity 0.040.04{:class=>"change"}MWinput
cooling_based_input_capacity --{:class=>"change"}MWinput
number_of_units 347 K347 K{:class=>"change"}
costs_per_plant
total_costs_per(:plant) 2,091.82,091.8{:class=>"change"}euro / plant
fixed_costs_per(:plant) 303.3303.3{:class=>"change"}
cost_of_capital_per(:plant) 4040{:class=>"change"}
depreciation_costs_per(:plant) 133.3133.3{:class=>"change"}
variable_costs_per(:plant) 1,788.51,788.5{:class=>"change"}
fuel_costs_per(:plant) 1,788.51,788.5{:class=>"change"}
co2_emissions_costs_per(:plant) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:plant) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:plant) 130130{:class=>"change"}
variable_operation_and_maintenance_costs_per(:plant) 00{:class=>"change"}
total_initial_investment_per(:plant) 2,0002,000{:class=>"change"}
costs_per_node
total_costs_per(:node) 724.99 M724.99 M{:class=>"change"}
fixed_costs_per(:node) 105.13 M105.13 M{:class=>"change"}
cost_of_capital_per(:node) 13.86 M13.86 M{:class=>"change"}
depreciation_costs_per(:node) 46.21 M46.21 M{:class=>"change"}
variable_costs_per(:node) 619.86 M619.86 M{:class=>"change"}
fuel_costs_per(:node) 619.86 M619.86 M{:class=>"change"}
co2_emissions_costs_per(:node) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:node) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:node) 45.06 M45.06 M{:class=>"change"}
variable_operation_and_maintenance_costs_per(:node) 00{:class=>"change"}
total_initial_investment_per(:node) 693.17 M693.17 M{:class=>"change"}
costs_per_mw_electricity
total_costs_per(:mw_electricity) 00{:class=>"change"}
fixed_costs_per(:mw_electricity) 00{:class=>"change"}
cost_of_capital_per(:mw_electricity) 00{:class=>"change"}
depreciation_costs_per(:mw_electricity) 00{:class=>"change"}
variable_costs_per(:mw_electricity) 00{:class=>"change"}
fuel_costs_per(:mw_electricity) 00{:class=>"change"}
co2_emissions_costs_per(:mw_electricity) NaNNaN{:class=>"change"}
captured_biogenic_co2_costs_per(:mw_electricity) NaNNaN{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mw_electricity) 00{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mw_electricity) NaNNaN{:class=>"change"}
total_initial_investment_per(:mw_electricity) 00{:class=>"change"}
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 00{:class=>"change"}
fixed_costs_per(:mwh_electricity) 00{:class=>"change"}
cost_of_capital_per(:mwh_electricity) 00{:class=>"change"}
depreciation_costs_per(:mwh_electricity) 00{:class=>"change"}
variable_costs_per(:mwh_electricity) 00{:class=>"change"}
fuel_costs_per(:mwh_electricity) 00{:class=>"change"}
co2_emissions_costs_per(:mwh_electricity) NaNNaN{:class=>"change"}
captured_biogenic_co2_costs_per(:mwh_electricity) NaNNaN{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 00{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaNNaN{:class=>"change"}
total_initial_investment_per(:mwh_electricity) 00{:class=>"change"}
costs_per_mw_heat
total_costs_per(:mw_heat) 48,647.248,647.2{:class=>"change"}
fixed_costs_per(:mw_heat) 7,054.37,054.3{:class=>"change"}
cost_of_capital_per(:mw_heat) 930.2930.2{:class=>"change"}
depreciation_costs_per(:mw_heat) 3,100.83,100.8{:class=>"change"}
variable_costs_per(:mw_heat) 41,592.941,592.9{:class=>"change"}
fuel_costs_per(:mw_heat) 41,592.941,592.9{:class=>"change"}
co2_emissions_costs_per(:mw_heat) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:mw_heat) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mw_heat) 3,023.33,023.3{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mw_heat) 00{:class=>"change"}
total_initial_investment_per(:mw_heat) 46,511.646,511.6{:class=>"change"}
costs_per_mwh_heat
total_costs_per(:mwh_heat) 20.1820.18{:class=>"change"}
fixed_costs_per(:mwh_heat) 2.932.93{:class=>"change"}
cost_of_capital_per(:mwh_heat) 0.3860.386{:class=>"change"}
depreciation_costs_per(:mwh_heat) 1.291.29{:class=>"change"}
variable_costs_per(:mwh_heat) 17.2517.25{:class=>"change"}
fuel_costs_per(:mwh_heat) 17.2517.25{:class=>"change"}
co2_emissions_costs_per(:mwh_heat) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:mwh_heat) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mwh_heat) 1.251.25{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mwh_heat) 00{:class=>"change"}
total_initial_investment_per(:mwh_heat) 19.2919.29{:class=>"change"}