Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
energy_hydrogen_transport_pipelines 0 Flexible
Reversed
44.8 %
55.2 %
Inputs Edges 0
2.42 %
Type MJ Node
Share 0 energy_national_gas_network_natural_gas
97.58 %
Type MJ Node
Share 0 energy_distribution_torrefied_biomass_pellets
Edges 0 Outputs
Node MJ Type
energy_hydrogen_transport_pipelines 0 Flexible
Reversed
44.8 %
55.2 %
Inputs Edges 0
2.42 %
Type MJ Node
Share 0 energy_national_gas_network_natural_gas
97.58 %
Type MJ Node
Share 0 energy_distribution_torrefied_biomass_pellets
Method Label Present Future Unit
technical
input_capacity * number_of_units Installed input capacity 0 0 MW
hydrogen_output_conversion Hydrogen output efficiency 44.8 44.8 %
full_load_hours Full load hours 7,884 7,884 hour / year
free_co2_factor CCS capture rate 90.0 90.0 %
cost
initial_investment_per(:mw_input_capacity) + cost_of_installing_per(:mw_input_capacity) + decommissioning_costs_per(:mw_input_capacity) Investment over lifetime per MW input 354361 354361 EUR / MW
ccs_investment_per(:mw_input_capacity) Additional initial investment for CCS 182948 182948 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_input_capacity) Fixed operation and maintenance costs 25204 25204 EUR / MW / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 1,110.9 1,110.9 EUR / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour Additional variable operation and maintenance costs for CCS 0 0 EUR / full load hour
wacc Weighted average cost of capital 7.0 7.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? true true boolean
other
technical_lifetime Technical lifetime 40 40 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0 0 MWth
hydrogen_output_capacity 215.8 215.8 0% MW
free_co2_factor 0.9 0.9 0%
ccs_capture_rate 0.9 0.9 0%
construction_time 3 3 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 7,884 7,884 0%
households_supplied_per_unit - -
land_use_per_unit 0.202 0.202 0%
takes_part_in_ets 1 1 0% yes=1 / no=0
technical_lifetime 40 40 0% year
typical_input_capacity 481.7 481.7 0% MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 144.01 M 144.01 M 0% euro / unit
ccs_investment 88.12 M 88.12 M 0% euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 26.68 M 26.68 M 0% euro / unit
fixed_operation_and_maintenance_costs_per_year 12.14 M 12.14 M 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 1,110.9 1,110.9 0% euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.07 0.07 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0.9 0.9 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error 0 0
misc
demand_expected_value 0 0
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.006 0.006 0%
weighted_carrier_co2_per_mj 0.001 0.001 0%
sustainability_share 0.976 0.976 0%
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 481.7 481.7 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity - - MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 111.8 M 111.8 M 0% euro / plant
fixed_costs_per(:plant) 28.35 M 28.35 M 0%
cost_of_capital_per(:plant) 9,737 K 9,737 K 0%
depreciation_costs_per(:plant) 6,470 K 6,470 K 0%
variable_costs_per(:plant) 83.45 M 83.45 M 0%
fuel_costs_per(:plant) 85.18 M 85.18 M 0%
co2_emissions_costs_per(:plant) 2,179 2,179 0%
captured_biogenic_co2_costs_per(:plant) -10.49 M -10.49 M 0%
fixed_operation_and_maintenance_costs_per(:plant) 12.14 M 12.14 M 0%
variable_operation_and_maintenance_costs_per(:plant) 8,759 K 8,759 K 0%
total_initial_investment_per(:plant) 232.13 M 232.13 M 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) 0 0
captured_biogenic_co2_costs_per(:mw_electricity) Infinity Infinity
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) 0 0
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) 0 0
captured_biogenic_co2_costs_per(:mwh_electricity) Infinity Infinity
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 0 0
fixed_costs_per(:mw_heat) 0 0
cost_of_capital_per(:mw_heat) 0 0
depreciation_costs_per(:mw_heat) 0 0
variable_costs_per(:mw_heat) 0 0
fuel_costs_per(:mw_heat) 0 0
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) Infinity Infinity
fixed_operation_and_maintenance_costs_per(:mw_heat) 0 0
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 0 0
costs_per_mwh_heat
total_costs_per(:mwh_heat) 0 0
fixed_costs_per(:mwh_heat) 0 0
cost_of_capital_per(:mwh_heat) 0 0
depreciation_costs_per(:mwh_heat) 0 0
variable_costs_per(:mwh_heat) 0 0
fuel_costs_per(:mwh_heat) 0 0
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) Infinity Infinity
fixed_operation_and_maintenance_costs_per(:mwh_heat) 0 0
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 0 0