Present 2.71 B 2.71 B 2.71 B
Future 2.71 B 2.71 B 2.71 B
Edges 2.71 B Outputs
Node MJ Type
households_useful_demand_for_cooling 2.71 B Share
100.0 %
0.0 %
Inputs Edges 2.71 B
94.74 %
Type MJ Node
Share 2.57 B environment_earth_ambient_cold
5.26 %
Type MJ Node
Share 142.6 M households_final_demand_for_cooling_electricity
Edges 2.71 B Outputs
Node MJ Type
households_useful_demand_for_cooling 2.71 B Share
100.0 %
0.0 %
Inputs Edges 2.71 B
94.74 %
Type MJ Node
Share 2.57 B environment_earth_ambient_cold
5.26 %
Type MJ Node
Share 142.6 M households_final_demand_for_cooling_electricity

Details

Sector households
Use energetic
Merit Order
group
households_cooling
level
lv
subtype
generic
type
consumer
Node groups
  1. heat_production
  2. application_group
  3. lv_net_demand
  4. wacc_households
  5. costs_building_and_installations_households
Used in Gqueries
  1. households_cooling_heatpump_ground_water_electricity_cop
  2. households_cooling_heatpump_ground_water_electricity_input_of_electricity
  3. households_cooling_heatpump_ground_water_electricity_number_of_units
  4. lv_households_cooling_load_curve
  5. total_cost_of_households_cooling_heatpump_ground_water_electricity
Used in Inputs
  1. households_cooling_heatpump_ground_water_electricity_share
  2. investment_costs_electric_heat_pumps
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 19 19 COP
heat_output_capacity Heat capacity per unit 0.01 0.01 MW / unit
full_load_hours Full load hours 560 560 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 13,904 13,904 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 100 100 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 2.0 2.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 00{:class=>"change"}MWe
heat_output_capacity 0.010.01{:class=>"change"}MWth
hydrogen_output_capacity 00{:class=>"change"}MW
free_co2_factor 00{:class=>"change"}
ccs_capture_rate --{:class=>"change"}
construction_time 00{:class=>"change"}
electrical_efficiency_when_using_coal --{:class=>"change"}
electrical_efficiency_when_using_wood_pellets --{:class=>"change"}
full_load_hours 560560{:class=>"change"}
households_supplied_per_unit --{:class=>"change"}
land_use_per_unit --{:class=>"change"}
takes_part_in_ets 00{:class=>"change"}yes=1 / no=0
technical_lifetime 1515{:class=>"change"}year
typical_input_capacity --{:class=>"change"}MWinput
output_capacity --{:class=>"change"}MW
input_efficiency --{:class=>"change"}
output_efficiency --{:class=>"change"}
cost
initial_investment 13,90413,904{:class=>"change"}euro / unit
ccs_investment 00{:class=>"change"}euro / unit
cost_of_installing 00{:class=>"change"}euro / unit
decommissioning_costs 00{:class=>"change"}euro / unit
fixed_operation_and_maintenance_costs_per_year 100100{:class=>"change"}euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 00{:class=>"change"}euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 00{:class=>"change"}euro / full load hour
fixed_costs_per_mw_input_capacity --{:class=>"change"}euro / MWinput
costs_per_mj --{:class=>"change"}
wacc 0.020.02{:class=>"change"}
profitability --{:class=>"change"}profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity --{:class=>"change"}eur/MWh
marginal_costs --{:class=>"change"}euro / MWh
max_consumption_price --{:class=>"change"}euro / MWh
merit_order
merit_order_full_load_hours --{:class=>"change"}
merit_order_capacity_factor --{:class=>"change"}
merit_order_position --{:class=>"change"}
security_of_supply
availability 00{:class=>"change"}
part_load_operating_point --{:class=>"change"}
part_load_efficiency_penalty --{:class=>"change"}
forecasting_error --{:class=>"change"}
misc
demand_expected_value 2.71 B2.71 B{:class=>"change"}
excel_id --{:class=>"change"}
max_demand --{:class=>"change"}
Node Calculations Present Future Change Unit
demand
demand 2.71 B2.71 B{:class=>"change"}
preset_demand --{:class=>"change"}
demand_of_sustainable 00{:class=>"change"}
weighted_carrier_cost_per_mj 00{:class=>"change"}
weighted_carrier_co2_per_mj 00{:class=>"change"}
sustainability_share 0.9560.954{:class=>"change"}
final_demand 142.6 M142.6 M{:class=>"change"}
primary_demand 273.45 M276.62 M{:class=>"change"}
primary_demand_of_fossil 12.06 M12.62 M{:class=>"change"}
primary_demand_of_sustainable 261.39 M264 M{:class=>"change"}
primary_demand_of_wood_pellets 6,571 K226 K{:class=>"change"}
primary_demand_of_biogas 1,944 K2,538 K{:class=>"change"}
primary_demand_of_electricity 16.58 M13.56 M{:class=>"change"}
primary_demand_of_coal 134.96 M117.79 M{:class=>"change"}
primary_demand_of_lng 1,163 K1,902 K{:class=>"change"}
primary_demand_of_natural_gas 67.38 M110.22 M{:class=>"change"}
primary_demand_of_biogenic_waste 7,188 K8,403 K{:class=>"change"}
primary_demand_of_non_biogenic_waste 5,882 K6,875 K{:class=>"change"}
primary_demand_of_uranium_oxide 19.26 M13.92 M{:class=>"change"}
primary_demand_of_imported_electricity 12.52 M12,126.3{:class=>"change"}
technical
input_capacity 0.010.01{:class=>"change"}
electric_based_input_capacity --{:class=>"change"}MWinput
heat_based_input_capacity --{:class=>"change"}MWinput
cooling_based_input_capacity 0.010.01{:class=>"change"}MWinput
number_of_units 134 K134 K{:class=>"change"}
costs_per_plant
total_costs_per(:plant) 1,1701,169.8{:class=>"change"}euro / plant
fixed_costs_per(:plant) 1,1661,166{:class=>"change"}
cost_of_capital_per(:plant) 139139{:class=>"change"}
depreciation_costs_per(:plant) 926.9926.9{:class=>"change"}
variable_costs_per(:plant) 3.993.85{:class=>"change"}
fuel_costs_per(:plant) 3.993.85{:class=>"change"}
co2_emissions_costs_per(:plant) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:plant) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:plant) 100100{:class=>"change"}
variable_operation_and_maintenance_costs_per(:plant) 00{:class=>"change"}
total_initial_investment_per(:plant) 13,90413,904{:class=>"change"}
costs_per_node
total_costs_per(:node) 157.24 M157.22 M{:class=>"change"}
fixed_costs_per(:node) 156.7 M156.7 M{:class=>"change"}
cost_of_capital_per(:node) 18.69 M18.69 M{:class=>"change"}
depreciation_costs_per(:node) 124.57 M124.57 M{:class=>"change"}
variable_costs_per(:node) 536 K517 K{:class=>"change"}
fuel_costs_per(:node) 536 K517 K{:class=>"change"}
co2_emissions_costs_per(:node) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:node) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:node) 13.44 M13.44 M{:class=>"change"}
variable_operation_and_maintenance_costs_per(:node) 00{:class=>"change"}
total_initial_investment_per(:node) 1.87 B1.87 B{:class=>"change"}
costs_per_mw_electricity
total_costs_per(:mw_electricity) 00{:class=>"change"}
fixed_costs_per(:mw_electricity) 00{:class=>"change"}
cost_of_capital_per(:mw_electricity) 00{:class=>"change"}
depreciation_costs_per(:mw_electricity) 00{:class=>"change"}
variable_costs_per(:mw_electricity) 00{:class=>"change"}
fuel_costs_per(:mw_electricity) 00{:class=>"change"}
co2_emissions_costs_per(:mw_electricity) NaNNaN{:class=>"change"}
captured_biogenic_co2_costs_per(:mw_electricity) NaNNaN{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mw_electricity) 00{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mw_electricity) NaNNaN{:class=>"change"}
total_initial_investment_per(:mw_electricity) 00{:class=>"change"}
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 00{:class=>"change"}
fixed_costs_per(:mwh_electricity) 00{:class=>"change"}
cost_of_capital_per(:mwh_electricity) 00{:class=>"change"}
depreciation_costs_per(:mwh_electricity) 00{:class=>"change"}
variable_costs_per(:mwh_electricity) 00{:class=>"change"}
fuel_costs_per(:mwh_electricity) 00{:class=>"change"}
co2_emissions_costs_per(:mwh_electricity) NaNNaN{:class=>"change"}
captured_biogenic_co2_costs_per(:mwh_electricity) NaNNaN{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 00{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaNNaN{:class=>"change"}
total_initial_investment_per(:mwh_electricity) 00{:class=>"change"}
costs_per_mw_heat
total_costs_per(:mw_heat) 117 K117 K{:class=>"change"}
fixed_costs_per(:mw_heat) 117 K117 K{:class=>"change"}
cost_of_capital_per(:mw_heat) 13,90413,904{:class=>"change"}
depreciation_costs_per(:mw_heat) 92,693.392,693.3{:class=>"change"}
variable_costs_per(:mw_heat) 398.9384.5{:class=>"change"}
fuel_costs_per(:mw_heat) 398.9384.5{:class=>"change"}
co2_emissions_costs_per(:mw_heat) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:mw_heat) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mw_heat) 10,00010,000{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mw_heat) 00{:class=>"change"}
total_initial_investment_per(:mw_heat) 1,390 K1,390 K{:class=>"change"}
costs_per_mwh_heat
total_costs_per(:mwh_heat) 208.9208.9{:class=>"change"}
fixed_costs_per(:mwh_heat) 208.2208.2{:class=>"change"}
cost_of_capital_per(:mwh_heat) 24.8324.83{:class=>"change"}
depreciation_costs_per(:mwh_heat) 165.5165.5{:class=>"change"}
variable_costs_per(:mwh_heat) 0.7120.687{:class=>"change"}
fuel_costs_per(:mwh_heat) 0.7120.687{:class=>"change"}
co2_emissions_costs_per(:mwh_heat) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:mwh_heat) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mwh_heat) 17.8617.86{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mwh_heat) 00{:class=>"change"}
total_initial_investment_per(:mwh_heat) 2,482.92,482.9{:class=>"change"}