Present 1.25 B 1.25 B 1.25 B
Future 1.25 B 1.25 B 1.25 B
Edges 1.25 B Outputs
0.0 %
0.0 %
Node MJ Type
households_space_heater_heatpump_air_water_electricity_aggregator 1.25 B Share
100.0 %
Inputs Edges 1.25 B
77.78 %
Type MJ Node
Share 972.07 M environment_air_ambient_heat
22.22 %
Type MJ Node
Share 277.74 M households_final_demand_for_space_heating_electricity
Edges 1.25 B Outputs
0.0 %
0.0 %
Node MJ Type
households_space_heater_heatpump_air_water_electricity_aggregator 1.25 B Share
100.0 %
Inputs Edges 1.25 B
61.68 %
Type MJ Node
Share 770.89 M environment_air_ambient_heat
38.32 %
Type MJ Node
Share 478.92 M households_final_demand_for_space_heating_electricity

Details

Sector households
Use energetic
Fever (Heat)
base_cop
2.323
capacity
electricity: 0.0025889967637540458
cop_per_degree
0.0578
defer_for
4
efficiency_balanced_with
ambient_heat
efficiency_based_on
electricity
group
space_heating
share_in_group
0.0045926862232785306
technology_curve_type
tech_constant
type
producer
Storage
cost_per_mwh
154736.8
decay
0.0
volume
0.0
Node groups
  1. demand_driven
  2. heat_production
  3. etmoses
  4. merit_household_space_heating_producers
  5. application_group
  6. aggregator_producer
  7. lv_net_demand
  8. wacc_households
  9. merit_order_csv_include
  10. costs_building_and_installations_households
  11. ht_delivery_system_households
Used in Gqueries
  1. depreciation_costs_households_air_source_heat_pump_per_kw
  2. households_space_heater_heatpump_air_water_electricity_cop
  3. households_space_heater_heatpump_air_water_electricity_delta_in_investment_cost_table
  4. households_space_heater_heatpump_air_water_electricity_future_in_investment_cost_table
  5. households_space_heater_heatpump_air_water_electricity_input_of_electricity
  6. households_space_heater_heatpump_air_water_electricity_number_of_units
  7. households_space_heater_heatpump_air_water_electricity_present_in_investment_cost_table
  8. total_cost_of_households_space_heater_heatpump_air_water_electricity
  9. turk_full_load_hours_of_households_space_heater_collective_heatpump_water_water_ts_electricity
  10. turk_full_load_hours_of_households_space_heater_heatpump_air_water_electricity
  11. turk_number_of_units_of_households_space_heater_heatpump_air_water_electricity
  12. user_sortable_households_space_heater_heatpump_air_water_electricity_capacity
Used in Inputs
  1. efficiency_households_space_heater_heatpump_air_water_electricity
  2. households_heater_heatpump_air_water_electricity_heat_output_capacity
  3. households_heater_heatpump_air_water_electricity_share
  4. investment_costs_electric_heat_pumps
  5. investment_costs_households_storage_space_heating
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 4.5 2.61 COP
heat_output_capacity Heat capacity per unit 0.01 0.01 MW / unit
full_load_hours Full load hours 996.2 996.2 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 9,098 9,098 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 100 100 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 2.0 2.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0.01 0.01 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 996.2 996.2 0%
households_supplied_per_unit 1 1 0%
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 9,098 9,098 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 100 100 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.02 0.02 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 1.25 B 1.25 B 0%
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 1.25 B 1.25 B 0%
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.001 0.001 66%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.814 0.668 -17%
final_demand 277.74 M 478.92 M 72%
primary_demand 532.59 M 929.03 M 74%
primary_demand_of_fossil 99.21 M 308.67 M 211%
primary_demand_of_sustainable 433.38 M 620.35 M 43%
primary_demand_of_wood_pellets 12.8 M 760 K -94%
primary_demand_of_biogas 3,786 K 8,524 K 125%
primary_demand_of_electricity 32.29 M 45.56 M 41%
primary_demand_of_coal 262.86 M 395.58 M 50%
primary_demand_of_lng 2,265 K 6,388 K 182%
primary_demand_of_natural_gas 131.24 M 370.18 M 182%
primary_demand_of_biogenic_waste 14 M 28.22 M 101%
primary_demand_of_non_biogenic_waste 11.46 M 23.09 M 101%
primary_demand_of_uranium_oxide 37.51 M 46.73 M 24%
primary_demand_of_imported_electricity 24.38 M 40,726.1 -99%
technical
input_capacity 0.01 0.01 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity 0.01 0.01 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 34,849.1 34,849.1 0%
costs_per_plant
total_costs_per(:plant) 827.5 847.3 2% euro / plant
fixed_costs_per(:plant) 797.5 797.5 0%
cost_of_capital_per(:plant) 90.98 90.98 0%
depreciation_costs_per(:plant) 606.5 606.5 0%
variable_costs_per(:plant) 29.96 49.8 66%
fuel_costs_per(:plant) 29.96 49.8 66%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 100 100 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 9,098 9,098 0%
costs_per_node
total_costs_per(:node) 28.84 M 29.53 M 2%
fixed_costs_per(:node) 27.79 M 27.79 M 0%
cost_of_capital_per(:node) 3,171 K 3,171 K 0%
depreciation_costs_per(:node) 21.14 M 21.14 M 0%
variable_costs_per(:node) 1,044 K 1,736 K 66%
fuel_costs_per(:node) 1,044 K 1,736 K 66%
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 3,485 K 3,485 K 0%
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 317.06 M 317.06 M 0%
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 82,747.2 84,731.8 2%
fixed_costs_per(:mw_heat) 79,751.3 79,751.3 0%
cost_of_capital_per(:mw_heat) 9,098 9,098 0%
depreciation_costs_per(:mw_heat) 60,653.3 60,653.3 0%
variable_costs_per(:mw_heat) 2,995.8 4,980.5 66%
fuel_costs_per(:mw_heat) 2,995.8 4,980.5 66%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 10,000 10,000 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 910 K 910 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 83.06 85.05 2%
fixed_costs_per(:mwh_heat) 80.06 80.06 0%
cost_of_capital_per(:mwh_heat) 9.13 9.13 0%
depreciation_costs_per(:mwh_heat) 60.88 60.88 0%
variable_costs_per(:mwh_heat) 3.01 5 66%
fuel_costs_per(:mwh_heat) 3.01 5 66%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 10.04 10.04 0%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 913.3 913.3 0%