Present 0 0 0
Future 0 0 0

Details

Sector households
Use energetic
Fever (Heat)
base_cop
3.25
capacity
electricity: 0.0025889967637540458
cop_per_degree
0.0875
defer_for
4
efficiency_balanced_with
ambient_heat
efficiency_based_on
electricity
group
space_heating
share_in_group
0.0
technology_curve_type
tech_constant
type
producer
Storage
cost_per_mwh
0.0
decay
0.0
volume
0.0
Node groups
  1. demand_driven
  2. heat_production
  3. merit_household_space_heating_producers
  4. application_group
  5. aggregator_producer
  6. lv_net_demand
  7. wacc_households
  8. merit_order_csv_include
  9. costs_building_and_installations_households
Used in Gqueries
  1. user_sortable_households_space_heater_heatpump_surface_water_water_ts_electricity_capacity
Used in Inputs
  1. households_heater_heatpump_surface_water_water_ts_electricity_heat_output_capacity
  2. households_heater_heatpump_surface_water_water_ts_electricity_share
Method Label Present Future Unit
technical
coefficient_of_performance Coefficient of Performance 3.7 3.7 COP
heat_output_capacity Heat capacity per unit 0.01 0.01 MW / unit
full_load_hours Full load hours 0 0 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 9,098 9,098 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 100 100 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs NaN NaN EUR / full load hour
wacc Weighted average cost of capital 2.0 2.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0.01 0.01 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 0 0
households_supplied_per_unit 1 1 0%
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 9,098 9,098 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 100 100 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.02 0.02 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 0 0
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.001 0.001 -3%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.774 0.766 -1%
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 0.01 0.01 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity 0.01 0.01 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 797.5 797.5 0% euro / plant
fixed_costs_per(:plant) 797.5 797.5 0%
cost_of_capital_per(:plant) 90.98 90.98 0%
depreciation_costs_per(:plant) 606.5 606.5 0%
variable_costs_per(:plant) 0 0
fuel_costs_per(:plant) 0 0
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 100 100 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 9,098 9,098 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) NaN NaN
fuel_costs_per(:mw_electricity) NaN NaN
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) NaN NaN
fuel_costs_per(:mwh_electricity) NaN NaN
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 79,751.3 79,751.3 0%
fixed_costs_per(:mw_heat) 79,751.3 79,751.3 0%
cost_of_capital_per(:mw_heat) 9,098 9,098 0%
depreciation_costs_per(:mw_heat) 60,653.3 60,653.3 0%
variable_costs_per(:mw_heat) 0 0
fuel_costs_per(:mw_heat) 0 0
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 10,000 10,000 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 910 K 910 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 0 0
fixed_costs_per(:mwh_heat) 0 0
cost_of_capital_per(:mwh_heat) 0 0
depreciation_costs_per(:mwh_heat) 0 0
variable_costs_per(:mwh_heat) NaN NaN
fuel_costs_per(:mwh_heat) NaN NaN
co2_emissions_costs_per(:mwh_heat) NaN NaN
captured_biogenic_co2_costs_per(:mwh_heat) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 0 0
variable_operation_and_maintenance_costs_per(:mwh_heat) NaN NaN
total_initial_investment_per(:mwh_heat) 0 0