households_space_heater_wood_pellets
Present
18.36 B
18.36 B
18.36 B
Future
18.36 B
18.36 B
18.36 B
|
|
|
|
Details
Sector | households |
Use | energetic |
Fever (Heat) |
defer_for
4
group
space_heating
share_in_group
0.049358209153135255
technology_curve_type
tech_day_night
type
producer
|
Node groups |
|
Used in Gqueries |
|
Used in Inputs |
Node Summary
Method | Label | Present | Future | Unit |
---|---|---|---|---|
technical | ||||
heat_output_conversion | Heat efficiency (LHV) | 82.0 | 82.0 | % |
heat_output_capacity | Heat capacity per unit | 0.01 | 0.01 | MW / unit |
full_load_hours | Full load hours | 1,105.8 | 1,105.8 | hour / year |
cost | ||||
total_investment_over_lifetime_per(:plant) | Investment over lifetime per plant | 3,030 | 3,030 | EUR / unit |
fixed_operation_and_maintenance_costs_per(:plant) | Fixed operation and maintenance costs | 161.6 | 161.6 | EUR / unit / year |
variable_operation_and_maintenance_costs_per(:full_load_hour) | Variable operation and maintenance costs | 0 | 0 | EUR / full load hour |
wacc | Weighted average cost of capital | 2.0 | 2.0 | % |
takes_part_in_ets | Do emissions have to be paid through the ETS? | false | false | boolean |
other | ||||
technical_lifetime | Technical lifetime | 15 | 15 | years |
All Attributes
Node Attributes | Present | Future | Change | Unit |
---|---|---|---|---|
operational | ||||
electricity_output_capacity | 0 | 0 | MWe | |
heat_output_capacity | 0.01 | 0.01 | 0% | MWth |
hydrogen_output_capacity | 0 | 0 | MW | |
free_co2_factor | 0 | 0 | ||
ccs_capture_rate | - | - | ||
construction_time | 0 | 0 | ||
electrical_efficiency_when_using_coal | - | - | ||
electrical_efficiency_when_using_wood_pellets | - | - | ||
full_load_hours | 1,105.8 | 1,105.8 | 0% | |
households_supplied_per_unit | 1 | 1 | 0% | |
land_use_per_unit | - | - | ||
takes_part_in_ets | 0 | 0 | yes=1 / no=0 | |
technical_lifetime | 15 | 15 | 0% | year |
typical_input_capacity | - | - | MWinput | |
output_capacity | - | - | MW | |
input_efficiency | - | - | ||
output_efficiency | - | - | ||
cost | ||||
initial_investment | 3,030 | 3,030 | 0% | euro / unit |
ccs_investment | 0 | 0 | euro / unit | |
cost_of_installing | 0 | 0 | euro / unit | |
decommissioning_costs | 0 | 0 | euro / unit | |
fixed_operation_and_maintenance_costs_per_year | 161.6 | 161.6 | 0% | euro / unit / year |
variable_operation_and_maintenance_costs_per_full_load_hour | 0 | 0 | euro / full load hour | |
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour | 0 | 0 | euro / full load hour | |
fixed_costs_per_mw_input_capacity | - | - | euro / MWinput | |
costs_per_mj | - | - | ||
wacc | 0.02 | 0.02 | 0% | |
profitability | - | - | profitable / unprofitable / conditionally_profitable | |
profit_per_mwh_electricity | - | - | eur/MWh | |
marginal_costs | - | - | euro / MWh | |
max_consumption_price | - | - | euro / MWh | |
merit_order | ||||
merit_order_full_load_hours | - | - | ||
merit_order_capacity_factor | - | - | ||
merit_order_position | - | - | ||
security_of_supply | ||||
availability | 0 | 0 | ||
part_load_operating_point | - | - | ||
part_load_efficiency_penalty | - | - | ||
forecasting_error | - | - | ||
misc | ||||
demand_expected_value | 18.36 B | 18.36 B | 0% | |
excel_id | - | - | ||
max_demand | - | - |