households_water_heater_heatpump_pvt_electricity
Present
0
0
0
Future
0
0
0
|
|
|
|
Details
Sector | households |
Use | energetic |
Fever (Heat) |
group
households_hot_water
share_in_group
0.0
technology_curve_type
default
type
producer
|
Storage |
cost_per_mwh
50713.74906085649
decay
0.0
volume
0.005
|
Node groups |
|
Used in Gqueries |
|
Used in Inputs |
Node Summary
Method | Label | Present | Future | Unit |
---|---|---|---|---|
technical | ||||
coefficient_of_performance | Coefficient of Performance | 3.3 | 3.3 | COP |
heat_output_capacity | Heat capacity per unit | 0.008 | 0.008 | MW / unit |
full_load_hours | Full load hours | 0 | 0 | hour / year |
cost | ||||
total_investment_over_lifetime_per(:plant) | Investment over lifetime per plant | 253.6 | 253.6 | EUR / unit |
fixed_operation_and_maintenance_costs_per(:plant) | Fixed operation and maintenance costs | 0 | 0 | EUR / unit / year |
variable_operation_and_maintenance_costs_per(:full_load_hour) | Variable operation and maintenance costs | NaN | NaN | EUR / full load hour |
wacc | Weighted average cost of capital | 2.0 | 2.0 | % |
takes_part_in_ets | Do emissions have to be paid through the ETS? | false | false | boolean |
other | ||||
technical_lifetime | Technical lifetime | 18 | 18 | years |
All Attributes
Node Attributes | Present | Future | Change | Unit |
---|---|---|---|---|
operational | ||||
electricity_output_capacity | 0 | 0 | {:class=>"change"} | MWe |
heat_output_capacity | 0.008 | 0.008 | {:class=>"change"} | MWth |
hydrogen_output_capacity | 0 | 0 | {:class=>"change"} | MW |
free_co2_factor | 0 | 0 | {:class=>"change"} | |
ccs_capture_rate | - | - | {:class=>"change"} | |
construction_time | 0 | 0 | {:class=>"change"} | |
electrical_efficiency_when_using_coal | - | - | {:class=>"change"} | |
electrical_efficiency_when_using_wood_pellets | - | - | {:class=>"change"} | |
full_load_hours | 0 | 0 | {:class=>"change"} | |
households_supplied_per_unit | 1 | 1 | {:class=>"change"} | |
land_use_per_unit | - | - | {:class=>"change"} | |
takes_part_in_ets | 0 | 0 | {:class=>"change"} | yes=1 / no=0 |
technical_lifetime | 18 | 18 | {:class=>"change"} | year |
typical_input_capacity | - | - | {:class=>"change"} | MWinput |
output_capacity | - | - | {:class=>"change"} | MW |
input_efficiency | - | - | {:class=>"change"} | |
output_efficiency | - | - | {:class=>"change"} | |
cost | ||||
initial_investment | 0 | 0 | {:class=>"change"} | euro / unit |
ccs_investment | 0 | 0 | {:class=>"change"} | euro / unit |
cost_of_installing | 0 | 0 | {:class=>"change"} | euro / unit |
decommissioning_costs | 0 | 0 | {:class=>"change"} | euro / unit |
fixed_operation_and_maintenance_costs_per_year | 0 | 0 | {:class=>"change"} | euro / unit / year |
variable_operation_and_maintenance_costs_per_full_load_hour | 0 | 0 | {:class=>"change"} | euro / full load hour |
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour | 0 | 0 | {:class=>"change"} | euro / full load hour |
fixed_costs_per_mw_input_capacity | - | - | {:class=>"change"} | euro / MWinput |
costs_per_mj | - | - | {:class=>"change"} | |
wacc | 0.02 | 0.02 | {:class=>"change"} | |
profitability | - | - | {:class=>"change"} | profitable / unprofitable / conditionally_profitable |
profit_per_mwh_electricity | - | - | {:class=>"change"} | eur/MWh |
marginal_costs | - | - | {:class=>"change"} | euro / MWh |
max_consumption_price | - | - | {:class=>"change"} | euro / MWh |
merit_order | ||||
merit_order_full_load_hours | - | - | {:class=>"change"} | |
merit_order_capacity_factor | - | - | {:class=>"change"} | |
merit_order_position | - | - | {:class=>"change"} | |
security_of_supply | ||||
availability | 0 | 0 | {:class=>"change"} | |
part_load_operating_point | - | - | {:class=>"change"} | |
part_load_efficiency_penalty | - | - | {:class=>"change"} | |
forecasting_error | - | - | {:class=>"change"} | |
misc | ||||
demand_expected_value | 0 | 0 | {:class=>"change"} | |
excel_id | - | - | {:class=>"change"} | |
max_demand | - | - | {:class=>"change"} |