Present 3.96 B 3.96 B 3.96 B
Future 3.96 B 3.96 B 3.96 B
Edges 3.96 B Outputs
5.0 %
Node MJ Type
households_water_heater_resistive_electricity_aggregator 3.76 B Share
95.0 %
Inputs Edges 3.96 B
100.0 %
Type MJ Node
Share 3.96 B households_final_demand_for_hot_water_electricity
Edges 3.96 B Outputs
5.0 %
Node MJ Type
households_water_heater_resistive_electricity_aggregator 3.76 B Share
95.0 %
Inputs Edges 3.96 B
100.0 %
Type MJ Node
Share 3.96 B households_final_demand_for_hot_water_electricity

Details

Sector households
Use energetic
Fever (Heat)
group
households_hot_water
share_in_group
0.08068085081645061
technology_curve_type
default
type
producer
Node groups
  1. demand_driven
  2. heat_production
  3. etmoses
  4. merit_household_hot_water_producers
  5. application_group
  6. aggregator_producer
  7. lv_net_demand
  8. wacc_households
  9. merit_order_csv_include
  10. costs_building_and_installations_households
Used in Gqueries
  1. electricity_used_for_heating_in_households_except_heat_pumps
  2. households_water_heater_resistive_electricity_delta_in_investment_cost_table
  3. households_water_heater_resistive_electricity_future_in_investment_cost_table
  4. households_water_heater_resistive_electricity_number_of_units
  5. households_water_heater_resistive_electricity_present_in_investment_cost_table
  6. total_cost_of_households_water_heater_resistive_electricity
  7. turk_full_load_hours_of_households_water_heater_resistive_electricity
  8. turk_number_of_units_of_households_water_heater_resistive_electricity
Used in Inputs
  1. households_heater_electricity_heat_output_capacity
  2. households_heater_electricity_share
Method Label Present Future Unit
technical
heat_output_conversion Heat efficiency (LHV) 95.0 95.0 %
heat_output_capacity Heat capacity per unit 0.002 0.002 MW / unit
full_load_hours Full load hours 1,138 1,138 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 135 135 EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 3 3 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 2.0 2.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? false false boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 0 0 MWe
heat_output_capacity 0.002 0.002 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 0 0
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 1,138 1,138 0%
households_supplied_per_unit 0 0
land_use_per_unit - -
takes_part_in_ets 0 0 yes=1 / no=0
technical_lifetime 15 15 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 135 135 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 3 3 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 0 0 euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.02 0.02 0%
profitability - - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs - - euro / MWh
max_consumption_price - - euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0 0
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value 3.96 B 3.96 B 0%
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 3.96 B 3.96 B 0%
preset_demand - -
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.004 0.004 -3%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0.162 0.133 -17%
final_demand 3.96 B 3.96 B 0%
primary_demand 7.59 B 7.68 B 1%
primary_demand_of_fossil 6.37 B 6.66 B 4%
primary_demand_of_sustainable 1.23 B 1.02 B -16%
primary_demand_of_wood_pellets 182.48 M 6,286 K -96%
primary_demand_of_biogas 53.98 M 70.48 M 30%
primary_demand_of_electricity 460.39 M 376.69 M -18%
primary_demand_of_coal 3.75 B 3.27 B -12%
primary_demand_of_lng 32.29 M 52.82 M 63%
primary_demand_of_natural_gas 1.87 B 3.06 B 63%
primary_demand_of_biogenic_waste 199.62 M 233.35 M 16%
primary_demand_of_non_biogenic_waste 163.33 M 190.93 M 16%
primary_demand_of_uranium_oxide 534.89 M 386.44 M -27%
primary_demand_of_imported_electricity 347.69 M 337 K -99%
technical
input_capacity 0.002 0.002 0%
electric_based_input_capacity - - MWinput
heat_based_input_capacity 0.002 0.002 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 612 K 612 K 0%
costs_per_plant
total_costs_per(:plant) 37.67 36.79 -2% euro / plant
fixed_costs_per(:plant) 13.35 13.35 0%
cost_of_capital_per(:plant) 1.35 1.35 0%
depreciation_costs_per(:plant) 9 9 0%
variable_costs_per(:plant) 24.32 23.44 -3%
fuel_costs_per(:plant) 24.32 23.44 -3%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 3 3 0%
variable_operation_and_maintenance_costs_per(:plant) 0 0
total_initial_investment_per(:plant) 135 135 0%
costs_per_node
total_costs_per(:node) 23.06 M 22.52 M -2%
fixed_costs_per(:node) 8,173 K 8,173 K 0%
cost_of_capital_per(:node) 826 K 826 K 0%
depreciation_costs_per(:node) 5,510 K 5,510 K 0%
variable_costs_per(:node) 14.89 M 14.35 M -3%
fuel_costs_per(:node) 14.89 M 14.35 M -3%
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 1,837 K 1,837 K 0%
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 82.65 M 82.65 M 0%
costs_per_mw_electricity
total_costs_per(:mw_electricity) 0 0
fixed_costs_per(:mw_electricity) 0 0
cost_of_capital_per(:mw_electricity) 0 0
depreciation_costs_per(:mw_electricity) 0 0
variable_costs_per(:mw_electricity) 0 0
fuel_costs_per(:mw_electricity) 0 0
co2_emissions_costs_per(:mw_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mw_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mw_electricity) NaN NaN
total_initial_investment_per(:mw_electricity) 0 0
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 0 0
fixed_costs_per(:mwh_electricity) 0 0
cost_of_capital_per(:mwh_electricity) 0 0
depreciation_costs_per(:mwh_electricity) 0 0
variable_costs_per(:mwh_electricity) 0 0
fuel_costs_per(:mwh_electricity) 0 0
co2_emissions_costs_per(:mwh_electricity) NaN NaN
captured_biogenic_co2_costs_per(:mwh_electricity) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 0 0
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaN NaN
total_initial_investment_per(:mwh_electricity) 0 0
costs_per_mw_heat
total_costs_per(:mw_heat) 25,110.5 24,528.6 -2%
fixed_costs_per(:mw_heat) 8,900 8,900 0%
cost_of_capital_per(:mw_heat) 900 900 0%
depreciation_costs_per(:mw_heat) 6,000 6,000 0%
variable_costs_per(:mw_heat) 16,210.5 15,628.6 -3%
fuel_costs_per(:mw_heat) 16,210.5 15,628.6 -3%
co2_emissions_costs_per(:mw_heat) 0 0
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 2,000 2,000 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 0 0
total_initial_investment_per(:mw_heat) 90,000 90,000 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 22.07 21.55 -2%
fixed_costs_per(:mwh_heat) 7.82 7.82 0%
cost_of_capital_per(:mwh_heat) 0.791 0.791 0%
depreciation_costs_per(:mwh_heat) 5.27 5.27 0%
variable_costs_per(:mwh_heat) 14.24 13.73 -3%
fuel_costs_per(:mwh_heat) 14.24 13.73 -3%
co2_emissions_costs_per(:mwh_heat) 0 0
captured_biogenic_co2_costs_per(:mwh_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mwh_heat) 1.76 1.76 0%
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 0
total_initial_investment_per(:mwh_heat) 79.09 79.09 0%