Present 42.65 B 42.65 B 42.65 B
Future 42.65 B 42.65 B 42.65 B
Edges 42.65 B Outputs
10.0 %
Node MJ Type
industry_chemicals_other_network_gas_hybrid_heat 38.39 B Flexible
90.0 %
Inputs Edges 42.65 B
100.0 %
Type MJ Node
Share 42.65 B industry_final_demand_for_chemical_other_network_gas
Edges 42.65 B Outputs
10.0 %
Node MJ Type
industry_chemicals_other_network_gas_hybrid_heat 38.39 B Flexible
90.0 %
Inputs Edges 42.65 B
100.0 %
Type MJ Node
Share 42.65 B industry_final_demand_for_chemical_other_network_gas

Details

Sector industry
Use energetic
Network Gas
behavior
subordinate
profile
industry_chemicals_heat
subordinate_to
industry_chemicals_other_flexibility_p2h_network_gas_electricity
subordinate_to_output
useable_heat
type
consumer
Node groups
  1. heat_production
  2. chemical_industry
  3. other_chemical_industry
  4. application_group
  5. wacc_proven_tech
  6. costs_building_and_installations_industry
Used in Gqueries
  1. industry_chemicals_other_burner_network_gas_delta_in_investment_cost_table
  2. industry_chemicals_other_burner_network_gas_future_in_investment_cost_table
  3. industry_chemicals_other_burner_network_gas_present_in_investment_cost_table
  4. total_cost_of_industry_chemicals_other_burner_network_gas
Used in Inputs
Method Label Present Future Unit
technical
heat_output_conversion Heat efficiency (LHV) 90.0 90.0 %
heat_output_capacity Heat capacity per unit 100.0 100.0 MW / unit
full_load_hours Full load hours 2,190 2,190 hour / year
cost
total_investment_over_lifetime_per(:plant) Investment over lifetime per plant 6,000 K 6,000 K EUR / unit
fixed_operation_and_maintenance_costs_per(:plant) Fixed operation and maintenance costs 100,000 100,000 EUR / unit / year
variable_operation_and_maintenance_costs_per(:full_load_hour) Variable operation and maintenance costs 0 0 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? true true boolean
other
technical_lifetime Technical lifetime 15 15 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 00{:class=>"change"}MWe
heat_output_capacity 100100{:class=>"change"}MWth
hydrogen_output_capacity 00{:class=>"change"}MW
free_co2_factor 00{:class=>"change"}
ccs_capture_rate --{:class=>"change"}
construction_time 00{:class=>"change"}
electrical_efficiency_when_using_coal --{:class=>"change"}
electrical_efficiency_when_using_wood_pellets --{:class=>"change"}
full_load_hours 2,1902,190{:class=>"change"}
households_supplied_per_unit --{:class=>"change"}
land_use_per_unit 00{:class=>"change"}
takes_part_in_ets 11{:class=>"change"}yes=1 / no=0
technical_lifetime 1515{:class=>"change"}year
typical_input_capacity --{:class=>"change"}MWinput
output_capacity --{:class=>"change"}MW
input_efficiency --{:class=>"change"}
output_efficiency --{:class=>"change"}
cost
initial_investment 6,000 K6,000 K{:class=>"change"}euro / unit
ccs_investment 00{:class=>"change"}euro / unit
cost_of_installing 00{:class=>"change"}euro / unit
decommissioning_costs 00{:class=>"change"}euro / unit
fixed_operation_and_maintenance_costs_per_year 100,000100,000{:class=>"change"}euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 00{:class=>"change"}euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 00{:class=>"change"}euro / full load hour
fixed_costs_per_mw_input_capacity --{:class=>"change"}euro / MWinput
costs_per_mj --{:class=>"change"}
wacc 0.040.04{:class=>"change"}
profitability --{:class=>"change"}profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity --{:class=>"change"}eur/MWh
marginal_costs --{:class=>"change"}euro / MWh
max_consumption_price --{:class=>"change"}euro / MWh
merit_order
merit_order_full_load_hours --{:class=>"change"}
merit_order_capacity_factor --{:class=>"change"}
merit_order_position --{:class=>"change"}
security_of_supply
availability 00{:class=>"change"}
part_load_operating_point 00{:class=>"change"}
part_load_efficiency_penalty 00{:class=>"change"}
forecasting_error 00{:class=>"change"}
misc
demand_expected_value 42.65 B42.65 B{:class=>"change"}
excel_id --{:class=>"change"}
max_demand --{:class=>"change"}
Node Calculations Present Future Change Unit
demand
demand 42.65 B42.65 B{:class=>"change"}
preset_demand --{:class=>"change"}
demand_of_sustainable 00{:class=>"change"}
weighted_carrier_cost_per_mj 0.0050.005{:class=>"change"}
weighted_carrier_co2_per_mj 0.0560.056{:class=>"change"}
sustainability_share 0.0030.003{:class=>"change"}
final_demand 42.65 B42.65 B{:class=>"change"}
primary_demand 43.3 B43.3 B{:class=>"change"}
primary_demand_of_fossil 43.15 B43.15 B{:class=>"change"}
primary_demand_of_sustainable 151.03 M151.03 M{:class=>"change"}
primary_demand_of_biogas 149.67 M149.67 M{:class=>"change"}
primary_demand_of_lng 732.01 M732.01 M{:class=>"change"}
primary_demand_of_natural_gas 42.42 B42.42 B{:class=>"change"}
technical
input_capacity 111.1111.1{:class=>"change"}
electric_based_input_capacity --{:class=>"change"}MWinput
heat_based_input_capacity 111.1111.1{:class=>"change"}MWinput
cooling_based_input_capacity --{:class=>"change"}MWinput
number_of_units 48.6948.69{:class=>"change"}
costs_per_plant
total_costs_per(:plant) 5,157 K5,157 K{:class=>"change"}euro / plant
fixed_costs_per(:plant) 620 K620 K{:class=>"change"}
cost_of_capital_per(:plant) 120 K120 K{:class=>"change"}
depreciation_costs_per(:plant) 400 K400 K{:class=>"change"}
variable_costs_per(:plant) 4,537 K4,537 K{:class=>"change"}
fuel_costs_per(:plant) 4,479 K4,479 K{:class=>"change"}
co2_emissions_costs_per(:plant) 57,70657,706{:class=>"change"}
captured_biogenic_co2_costs_per(:plant) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:plant) 100,000100,000{:class=>"change"}
variable_operation_and_maintenance_costs_per(:plant) 00{:class=>"change"}
total_initial_investment_per(:plant) 6,000 K6,000 K{:class=>"change"}
costs_per_node
total_costs_per(:node) 251.08 M251.08 M{:class=>"change"}
fixed_costs_per(:node) 30.19 M30.19 M{:class=>"change"}
cost_of_capital_per(:node) 5,843 K5,843 K{:class=>"change"}
depreciation_costs_per(:node) 19.48 M19.48 M{:class=>"change"}
variable_costs_per(:node) 220.9 M220.9 M{:class=>"change"}
fuel_costs_per(:node) 218.09 M218.09 M{:class=>"change"}
co2_emissions_costs_per(:node) 2,810 K2,810 K{:class=>"change"}
captured_biogenic_co2_costs_per(:node) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:node) 4,869 K4,869 K{:class=>"change"}
variable_operation_and_maintenance_costs_per(:node) 00{:class=>"change"}
total_initial_investment_per(:node) 292.13 M292.13 M{:class=>"change"}
costs_per_mw_electricity
total_costs_per(:mw_electricity) 00{:class=>"change"}
fixed_costs_per(:mw_electricity) 00{:class=>"change"}
cost_of_capital_per(:mw_electricity) 00{:class=>"change"}
depreciation_costs_per(:mw_electricity) 00{:class=>"change"}
variable_costs_per(:mw_electricity) 00{:class=>"change"}
fuel_costs_per(:mw_electricity) 00{:class=>"change"}
co2_emissions_costs_per(:mw_electricity) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:mw_electricity) NaNNaN{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mw_electricity) 00{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mw_electricity) NaNNaN{:class=>"change"}
total_initial_investment_per(:mw_electricity) 00{:class=>"change"}
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 00{:class=>"change"}
fixed_costs_per(:mwh_electricity) 00{:class=>"change"}
cost_of_capital_per(:mwh_electricity) 00{:class=>"change"}
depreciation_costs_per(:mwh_electricity) 00{:class=>"change"}
variable_costs_per(:mwh_electricity) 00{:class=>"change"}
fuel_costs_per(:mwh_electricity) 00{:class=>"change"}
co2_emissions_costs_per(:mwh_electricity) 00{:class=>"change"}
captured_biogenic_co2_costs_per(:mwh_electricity) NaNNaN{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 00{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mwh_electricity) NaNNaN{:class=>"change"}
total_initial_investment_per(:mwh_electricity) 00{:class=>"change"}
costs_per_mw_heat
total_costs_per(:mw_heat) 51,57051,570{:class=>"change"}
fixed_costs_per(:mw_heat) 6,2006,200{:class=>"change"}
cost_of_capital_per(:mw_heat) 1,2001,200{:class=>"change"}
depreciation_costs_per(:mw_heat) 4,0004,000{:class=>"change"}
variable_costs_per(:mw_heat) 45,37045,370{:class=>"change"}
fuel_costs_per(:mw_heat) 44,79344,793{:class=>"change"}
co2_emissions_costs_per(:mw_heat) 577.1577.1{:class=>"change"}
captured_biogenic_co2_costs_per(:mw_heat) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mw_heat) 1,0001,000{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mw_heat) 00{:class=>"change"}
total_initial_investment_per(:mw_heat) 60,00060,000{:class=>"change"}
costs_per_mwh_heat
total_costs_per(:mwh_heat) 23.5523.55{:class=>"change"}
fixed_costs_per(:mwh_heat) 2.832.83{:class=>"change"}
cost_of_capital_per(:mwh_heat) 0.5480.548{:class=>"change"}
depreciation_costs_per(:mwh_heat) 1.831.83{:class=>"change"}
variable_costs_per(:mwh_heat) 20.7220.72{:class=>"change"}
fuel_costs_per(:mwh_heat) 20.4520.45{:class=>"change"}
co2_emissions_costs_per(:mwh_heat) 0.2630.263{:class=>"change"}
captured_biogenic_co2_costs_per(:mwh_heat) 00{:class=>"change"}
fixed_operation_and_maintenance_costs_per(:mwh_heat) 0.4570.457{:class=>"change"}
variable_operation_and_maintenance_costs_per(:mwh_heat) 00{:class=>"change"}
total_initial_investment_per(:mwh_heat) 27.427.4{:class=>"change"}