Present 19.71 B 19.71 B 19.71 B
Future 0 0 0
-100%
Edges 19.71 B Outputs
Node MJ Type
industry_locally_available_electricity 7.49 B Flexible
Reversed
38.0 %
20.0 %
Node MJ Type
industry_locally_available_steam_hot_water 8.28 B Flexible
Reversed
42.0 %
Inputs Edges 19.71 B
100.0 %
Type MJ Node
Share 19.71 B energy_mixer_for_gas_power_fuel
Edges 0 Outputs
Node MJ Type
industry_locally_available_electricity 0 Flexible
Reversed
38.0 %
20.0 %
Node MJ Type
industry_locally_available_steam_hot_water 0 Flexible
Reversed
42.0 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_mixer_for_gas_power_fuel

Details

Sector industry
Use energetic
Merit Order
level
mv
subtype
dispatchable
type
producer
Network Gas
demand_carrier
gas_power_fuelmix
profile
self: electricity_output_curve
type
consumer
Node groups
  1. preset_demand
  2. electricity_production
  3. dispatchable_production
  4. heat_production
  5. mv_net_supply
  6. wacc_proven_tech
  7. costs_production_chp_plants
  8. sankey_conversion_group
Used in Gqueries
  1. chp_electricity_in_source_of_heat_and_electricity_in_industry
  2. chp_heat_in_source_of_heat_and_electricity_in_industry
  3. electricity_demand_in_industry_supplied_by_central_production
  4. factsheet_supply_heat_from_rest_and_geothermal
  5. fossil_electricity_from_chps_in_industry
  6. fossil_heat_from_chps_in_industry
  7. heat_demand_in_industry_not_supplied_by_chps
  8. heat_from_chp_in_use_of_final_demand_in_industry
  9. industry_chp_turbine_gas_power_fuelmix
  10. industry_chp_turbine_gas_power_fuelmix_capacity_in_chp_properties
  11. industry_chp_turbine_gas_power_fuelmix_delta_in_investment_cost_table
  12. industry_chp_turbine_gas_power_fuelmix_electricity_production_in_chp_properties
  13. industry_chp_turbine_gas_power_fuelmix_future_in_investment_cost_table
  14. industry_chp_turbine_gas_power_fuelmix_heat_production_in_chp_properties
  15. industry_chp_turbine_gas_power_fuelmix_in_industrial_heat_network_mekko
  16. industry_chp_turbine_gas_power_fuelmix_number_of_units_in_chp_properties
  17. industry_chp_turbine_gas_power_fuelmix_present_in_investment_cost_table
  18. industry_fuelmix_network_gas_in_co2_sankey
  19. industry_fuelmix_oil_in_co2_sankey
  20. industry_fuelmix_total_in_co2_sankey
  21. merit_order_industry_chp_gas_turbine_availability_in_merit_order_table
  22. merit_order_industry_chp_gas_turbine_capacity_in_merit_order_table
  23. merit_order_industry_chp_gas_turbine_full_load_hours_in_merit_order_table
  24. merit_order_industry_chp_gas_turbine_load_factor_in_merit_order_table
  25. merit_order_industry_chp_gas_turbine_operating_costs_in_merit_order_table
  26. merit_order_industry_chp_gas_turbine_position_in_merit_order_table
  27. renewable_electricity_from_chps_in_industry
  28. renewable_heat_from_chps_in_industry
  29. total_cost_of_industry_chp_turbine_gas_power_fuelmix
Used in Inputs
  1. capacity_of_industry_chp_turbine_gas_power_fuelmix
  2. efficiency_industry_chp_turbine_gas_power_fuelmix_electricity
  3. efficiency_industry_chp_turbine_gas_power_fuelmix_heat
  4. external_coupling_capacity_of_industry_chp_turbine_gas_power_fuelmix
  5. external_coupling_efficiency_industry_chp_turbine_gas_power_fuelmix_electricity
  6. external_coupling_efficiency_industry_chp_turbine_gas_power_fuelmix_heat
  7. investment_costs_combustion_gas_plant
  8. om_costs_combustion_gas_plant
Method Label Present Future Unit
technical
electricity_output_capacity * number_of_units Installed electrical capacity 650.1 650.1 MW
electricity_output_conversion Electrical efficiency 38.0 38.0 %
heat_output_conversion Heat efficiency 42.0 42.0 %
full_load_hours Full load hours 3,200 0 hour / year
cost
total_investment_over_lifetime_per(:mw_electricity) Investment over lifetime per MW 850151 850151 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_electricity) Fixed operation and maintenance costs 7001 7001 EUR / MW / year
variable_operation_and_maintenance_costs_per_full_load_hour Variable operation and maintenance costs 157 157 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? true true boolean
other
technical_lifetime Technical lifetime 25 25 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 44.99 44.99 0% MWe
heat_output_capacity 49.73 49.73 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 1.5 1.5 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 3,200 0 -100%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 1 1 0% yes=1 / no=0
technical_lifetime 25 25 0% year
typical_input_capacity 118.4 118.4 0% MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 38.25 M 38.25 M 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 315 K 315 K 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 157.5 157.5 0% euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs 54.09 54.09 0% euro / MWh
max_consumption_price 54.09 54.09 0% euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - 16
security_of_supply
availability 0.9 0.9 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value - -
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 19.71 B 0 -100%
preset_demand 19.71 B 19.71 B 0%
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.005 0.005 0%
weighted_carrier_co2_per_mj 0.058 0.058 0%
sustainability_share 0.003 0.003 0%
final_demand 0 0
primary_demand 19.98 B 0 -100%
primary_demand_of_fossil 19.92 B 0 -100%
primary_demand_of_sustainable 63.93 M 0 -100%
primary_demand_of_crude_oil 1.63 B 0 -100%
primary_demand_of_biogas 63.44 M 0 -100%
primary_demand_of_lng 310.25 M 0 -100%
primary_demand_of_natural_gas 17.98 B 0 -100%
technical
input_capacity 118.4 118.4 0%
electric_based_input_capacity 118.4 118.4 0% MWinput
heat_based_input_capacity 118.4 118.4 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 14.45 14.45 0%
costs_per_plant
total_costs_per(:plant) 10.44 M 2,656 K -74% euro / plant
fixed_costs_per(:plant) 2,656 K 2,656 K 0%
cost_of_capital_per(:plant) 811 K 811 K 0%
depreciation_costs_per(:plant) 1,530 K 1,530 K 0%
variable_costs_per(:plant) 7,788 K 0 -100%
fuel_costs_per(:plant) 7,192 K 0 -100%
co2_emissions_costs_per(:plant) 92,094.3 0 -100%
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 315 K 315 K 0%
variable_operation_and_maintenance_costs_per(:plant) 504 K 0 -100%
total_initial_investment_per(:plant) 38.25 M 38.25 M 0%
costs_per_node
total_costs_per(:node) 150.9 M 38.37 M -74%
fixed_costs_per(:node) 38.37 M 38.37 M 0%
cost_of_capital_per(:node) 11.72 M 11.72 M 0%
depreciation_costs_per(:node) 22.11 M 22.11 M 0%
variable_costs_per(:node) 112.53 M 0 -100%
fuel_costs_per(:node) 103.91 M 0 -100%
co2_emissions_costs_per(:node) 1,331 K 0 -100%
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 4,551 K 4,551 K 0%
variable_operation_and_maintenance_costs_per(:node) 7,282 K 0 -100%
total_initial_investment_per(:node) 552.65 M 552.65 M 0%
costs_per_mw_electricity
total_costs_per(:mw_electricity) 232 K 59,030.5 -74%
fixed_costs_per(:mw_electricity) 59,030.5 59,030.5 0%
cost_of_capital_per(:mw_electricity) 18,023.2 18,023.2 0%
depreciation_costs_per(:mw_electricity) 34,006 34,006 0%
variable_costs_per(:mw_electricity) 173 K 0 -100%
fuel_costs_per(:mw_electricity) 160 K 0 -100%
co2_emissions_costs_per(:mw_electricity) 2,046.9 0 -100%
captured_biogenic_co2_costs_per(:mw_electricity) 0 0
fixed_operation_and_maintenance_costs_per(:mw_electricity) 7,001.2 7,001.2 0%
variable_operation_and_maintenance_costs_per(:mw_electricity) 11,202 0 -100%
total_initial_investment_per(:mw_electricity) 850 K 850 K 0%
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 72.54 0 -100%
fixed_costs_per(:mwh_electricity) 18.45 0 -100%
cost_of_capital_per(:mwh_electricity) 5.63 0 -100%
depreciation_costs_per(:mwh_electricity) 10.63 0 -100%
variable_costs_per(:mwh_electricity) 54.09 NaN
fuel_costs_per(:mwh_electricity) 49.95 NaN
co2_emissions_costs_per(:mwh_electricity) 0.64 NaN
captured_biogenic_co2_costs_per(:mwh_electricity) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 2.19 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_electricity) 3.5 NaN
total_initial_investment_per(:mwh_electricity) 265.7 0 -100%
costs_per_mw_heat
total_costs_per(:mw_heat) 210 K 53,408.5 -74%
fixed_costs_per(:mw_heat) 53,408.5 53,408.5 0%
cost_of_capital_per(:mw_heat) 16,306.7 16,306.7 0%
depreciation_costs_per(:mw_heat) 30,767.4 30,767.4 0%
variable_costs_per(:mw_heat) 157 K 0 -100%
fuel_costs_per(:mw_heat) 145 K 0 -100%
co2_emissions_costs_per(:mw_heat) 1,852 0 -100%
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 6,334.5 6,334.5 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 10,135.1 0 -100%
total_initial_investment_per(:mw_heat) 769 K 769 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 65.63 0 -100%
fixed_costs_per(:mwh_heat) 16.69 0 -100%
cost_of_capital_per(:mwh_heat) 5.1 0 -100%
depreciation_costs_per(:mwh_heat) 9.61 0 -100%
variable_costs_per(:mwh_heat) 48.94 NaN
fuel_costs_per(:mwh_heat) 45.2 NaN
co2_emissions_costs_per(:mwh_heat) 0.579 NaN
captured_biogenic_co2_costs_per(:mwh_heat) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 1.98 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_heat) 3.17 NaN
total_initial_investment_per(:mwh_heat) 240.4 0 -100%