Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
energy_power_hv_network_electricity 0 Flexible
Reversed
36.93 %
63.07 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_distribution_uranium_oxide
Edges 0 Outputs
Node MJ Type
energy_power_hv_network_electricity 0 Flexible
Reversed
36.93 %
63.07 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_distribution_uranium_oxide

Details

Sector energy
Use undefined
Merit Order
level
hv
subtype
dispatchable
type
producer
Node groups
  1. preset_demand
  2. central_production
  3. electricity_production
  4. dispatchable_production
  5. hv_net_supply
  6. wacc_unproven_tech
  7. costs_production_power_plants
  8. sankey_conversion_group
Used in Gqueries
  1. capacity_of_energy_power_nuclear_gen3_uranium_oxide_output_curve
  2. costs_of_nuclear_3rd_generation_in_overview_costs_of_electricity_production
  3. energy_power_nuclear_gen3_uranium_oxide
  4. energy_power_nuclear_gen3_uranium_oxide_delta_in_investment_cost_table
  5. energy_power_nuclear_gen3_uranium_oxide_future_in_investment_cost_table
  6. energy_power_nuclear_gen3_uranium_oxide_output_curve
  7. energy_power_nuclear_gen3_uranium_oxide_present_in_investment_cost_table
  8. etflex_score_deviations_from_reference_scenario
  9. etflex_score_nuclear_waste
  10. investment_for_nuclear_3rd_generation_in_overview_costs_of_electricity_production
  11. merit_order_nuclear_iii_availability_in_merit_order_table
  12. merit_order_nuclear_iii_capacity_in_merit_order_table
  13. merit_order_nuclear_iii_full_load_hours_in_merit_order_table
  14. merit_order_nuclear_iii_load_factor_in_merit_order_table
  15. merit_order_nuclear_iii_operating_costs_in_merit_order_table
  16. merit_order_nuclear_iii_position_in_merit_order_table
  17. total_cost_of_energy_power_nuclear_gen3_uranium_oxide
Used in Inputs
  1. capacity_of_energy_power_nuclear_gen3_uranium_oxide
  2. efficiency_energy_power_nuclear_gen3_uranium_oxide
  3. flh_of_energy_power_nuclear_gen3_uranium_oxide
  4. investment_costs_nuclear_nuclear_plant
  5. merit_order_subtype_of_energy_power_nuclear_uranium_oxide
  6. om_costs_nuclear_nuclear_plant
Method Label Present Future Unit
technical
electricity_output_capacity * number_of_units Installed electrical capacity 0 0 MW
electricity_output_conversion Electrical efficiency 36.9 36.9 %
full_load_hours Full load hours 8,000 0 hour / year
cost
total_investment_over_lifetime_per(:mw_electricity) Investment over lifetime per MW 5025500 5025500 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_electricity) Fixed operation and maintenance costs 91770 91770 EUR / MW / year
variable_operation_and_maintenance_costs_per_full_load_hour Variable operation and maintenance costs 4000 4000 EUR / full load hour
wacc Weighted average cost of capital 7.0 7.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? true true boolean
other
technical_lifetime Technical lifetime 60 60 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 1,600 1,600 0% MWe
heat_output_capacity 0 0 MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 9 9 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 8,000 0 -100%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 1 1 0% yes=1 / no=0
technical_lifetime 60 60 0% year
typical_input_capacity - - MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 6.99 B 6.99 B 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 1.05 B 1.05 B 0% euro / unit
fixed_operation_and_maintenance_costs_per_year 146.83 M 146.83 M 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 4,000 4,000 0% euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.07 0.07 0%
profitability - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs 4.02 4.02 0% euro / MWh
max_consumption_price 4.02 4.02 0% euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0.92 0.92 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value - -
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand 0 0
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0 0 0%
weighted_carrier_co2_per_mj 0 0
sustainability_share 0 0
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 4,332.5 4,332.5 0%
electric_based_input_capacity 4,332.5 4,332.5 0% MWinput
heat_based_input_capacity - - MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 655.95 M 604.49 M -7% euro / plant
fixed_costs_per(:plant) 604.49 M 604.49 M 0%
cost_of_capital_per(:plant) 323.64 M 323.64 M 0%
depreciation_costs_per(:plant) 134.01 M 134.01 M 0%
variable_costs_per(:plant) 51.46 M 0 -100%
fuel_costs_per(:plant) 19.46 M 0 -100%
co2_emissions_costs_per(:plant) 0 0
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 146.83 M 146.83 M 0%
variable_operation_and_maintenance_costs_per(:plant) 32 M 0 -100%
total_initial_investment_per(:plant) 6.99 B 6.99 B 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 410 K 378 K -7%
fixed_costs_per(:mw_electricity) 378 K 378 K 0%
cost_of_capital_per(:mw_electricity) 202 K 202 K 0%
depreciation_costs_per(:mw_electricity) 83,758.3 83,758.3 0%
variable_costs_per(:mw_electricity) 32,164.3 0 -100%
fuel_costs_per(:mw_electricity) 12,164.3 0 -100%
co2_emissions_costs_per(:mw_electricity) 0 0
captured_biogenic_co2_costs_per(:mw_electricity) 0 0
fixed_operation_and_maintenance_costs_per(:mw_electricity) 91,770 91,770 0%
variable_operation_and_maintenance_costs_per(:mw_electricity) 20,000 0 -100%
total_initial_investment_per(:mw_electricity) 4,370 K 4,370 K 0%
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 51.25 0 -100%
fixed_costs_per(:mwh_electricity) 47.23 0 -100%
cost_of_capital_per(:mwh_electricity) 25.28 0 -100%
depreciation_costs_per(:mwh_electricity) 10.47 0 -100%
variable_costs_per(:mwh_electricity) 4.02 NaN
fuel_costs_per(:mwh_electricity) 1.52 NaN
co2_emissions_costs_per(:mwh_electricity) 0 NaN
captured_biogenic_co2_costs_per(:mwh_electricity) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 11.47 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_electricity) 2.5 NaN
total_initial_investment_per(:mwh_electricity) 546.3 0 -100%
costs_per_mw_heat
total_costs_per(:mw_heat) 0 0
fixed_costs_per(:mw_heat) 0 0
cost_of_capital_per(:mw_heat) 0 0
depreciation_costs_per(:mw_heat) 0 0
variable_costs_per(:mw_heat) 0 NaN
fuel_costs_per(:mw_heat) 0 NaN
co2_emissions_costs_per(:mw_heat) NaN NaN
captured_biogenic_co2_costs_per(:mw_heat) NaN NaN
fixed_operation_and_maintenance_costs_per(:mw_heat) 0 0
variable_operation_and_maintenance_costs_per(:mw_heat) 0 NaN
total_initial_investment_per(:mw_heat) 0 0
costs_per_mwh_heat
total_costs_per(:mwh_heat) 0 0
fixed_costs_per(:mwh_heat) 0 0
cost_of_capital_per(:mwh_heat) 0 0
depreciation_costs_per(:mwh_heat) 0 0
variable_costs_per(:mwh_heat) 0 NaN
fuel_costs_per(:mwh_heat) 0 NaN
co2_emissions_costs_per(:mwh_heat) NaN NaN
captured_biogenic_co2_costs_per(:mwh_heat) NaN NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 0 0
variable_operation_and_maintenance_costs_per(:mwh_heat) 0 NaN
total_initial_investment_per(:mwh_heat) 0 0