Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
energy_power_hv_network_electricity 0 Flexible
Reversed
46.0 %
12.0 %
Node MJ Type
energy_transmission_mt_steam_hot_water 0 Flexible
Reversed
42.0 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_national_gas_network_natural_gas
Edges 0 Outputs
Node MJ Type
energy_power_hv_network_electricity 0 Flexible
Reversed
46.0 %
12.0 %
Node MJ Type
energy_transmission_mt_steam_hot_water 0 Flexible
Reversed
42.0 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_national_gas_network_natural_gas

Details

Sector energy
Use energetic
Heat network (MT)
group
self: electricity_output_curve
subtype
must_run
type
producer
Merit Order
level
hv
subtype
dispatchable
type
producer
Network Gas
profile
self: electricity_output_curve
type
consumer
Node groups
  1. preset_demand
  2. central_production
  3. electricity_production
  4. dispatchable_production
  5. heat_production
  6. hv_net_supply
  7. wacc_proven_tech
  8. primary_heat_infrastructure
  9. costs_production_chp_plants
  10. sankey_conversion_group
Used in Gqueries
  1. energy_chp_combined_cycle_mt_network_gas_capacity_in_chp_properties
  2. energy_chp_combined_cycle_mt_network_gas_electricity_production_in_chp_properties
  3. energy_chp_combined_cycle_mt_network_gas_heat_production_in_chp_properties
  4. energy_chp_combined_cycle_mt_network_gas_number_of_units_in_chp_properties
  5. energy_chp_combined_cycle_network_gas
  6. energy_chp_combined_cycle_network_gas_mt_steam_hot_water_output_curve
  7. factsheet_supply_heat_from_rest_and_geothermal
  8. merit_order_gas_chp_ccgt_mt_availability_in_merit_order_table
  9. merit_order_gas_chp_ccgt_mt_capacity_in_merit_order_table
  10. merit_order_gas_chp_ccgt_mt_full_load_hours_in_merit_order_table
  11. merit_order_gas_chp_ccgt_mt_load_factor_in_merit_order_table
  12. merit_order_gas_chp_ccgt_mt_operating_costs_in_merit_order_table
  13. merit_order_gas_chp_ccgt_mt_position_in_merit_order_table
Used in Inputs
  1. capacity_of_energy_chp_combined_cycle_network_gas
  2. efficiency_energy_chp_combined_cycle_network_gas_electricity
  3. efficiency_energy_chp_combined_cycle_network_gas_heat
  4. investment_costs_combustion_gas_plant
  5. om_costs_combustion_gas_plant
  6. share_of_energy_chp_combined_cycle_ht_network_gas
  7. share_of_energy_chp_combined_cycle_mt_network_gas
Method Label Present Future Unit
technical
electricity_output_capacity * number_of_units Installed electrical capacity 0 0 MW
electricity_output_conversion Electrical efficiency 46.0 46.0 %
heat_output_conversion Heat efficiency 42.0 42.0 %
full_load_hours Full load hours 3,700 0 hour / year
cost
total_investment_over_lifetime_per(:mw_electricity) Investment over lifetime per MW 958583 958583 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_electricity) Fixed operation and maintenance costs 9129 9129 EUR / MW / year
variable_operation_and_maintenance_costs_per_full_load_hour Variable operation and maintenance costs 328 328 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? true true boolean
other
technical_lifetime Technical lifetime 30 30 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 120 120 0% MWe
heat_output_capacity 109.6 109.6 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 2.5 2.5 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 3,700 0 -100%
households_supplied_per_unit - -
land_use_per_unit 0.1 0.1 0%
takes_part_in_ets 1 1 0% yes=1 / no=0
technical_lifetime 30 30 0% year
typical_input_capacity 260.9 260.9 0% MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 115.04 M 115.04 M 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 1,096 K 1,096 K 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 328.7 328.7 0% euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs 23.93 23.93 0% euro / MWh
max_consumption_price 23.93 23.93 0% euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0.9 0.9 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value - -
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand 0 0
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.005 0.005 0%
weighted_carrier_co2_per_mj 0.056 0.056 0%
sustainability_share 0.003 0.003 0%
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 260.9 260.9 0%
electric_based_input_capacity 260.9 260.9 0% MWinput
heat_based_input_capacity 260.9 260.9 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 26.64 M 7,423 K -72% euro / plant
fixed_costs_per(:plant) 7,423 K 7,423 K 0%
cost_of_capital_per(:plant) 2,493 K 2,493 K 0%
depreciation_costs_per(:plant) 3,835 K 3,835 K 0%
variable_costs_per(:plant) 19.21 M 0 -100%
fuel_costs_per(:plant) 17.77 M 0 -100%
co2_emissions_costs_per(:plant) 229 K 0 -100%
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 1,096 K 1,096 K 0%
variable_operation_and_maintenance_costs_per(:plant) 1,216 K 0 -100%
total_initial_investment_per(:plant) 115.04 M 115.04 M 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 222 K 61,851.5 -72%
fixed_costs_per(:mw_electricity) 61,851.5 61,851.5 0%
cost_of_capital_per(:mw_electricity) 20,769.3 20,769.3 0%
depreciation_costs_per(:mw_electricity) 31,952.8 31,952.8 0%
variable_costs_per(:mw_electricity) 160 K 0 -100%
fuel_costs_per(:mw_electricity) 148 K 0 -100%
co2_emissions_costs_per(:mw_electricity) 1,907.5 0 -100%
captured_biogenic_co2_costs_per(:mw_electricity) 0 0
fixed_operation_and_maintenance_costs_per(:mw_electricity) 9,129.4 9,129.4 0%
variable_operation_and_maintenance_costs_per(:mw_electricity) 10,133.7 0 -100%
total_initial_investment_per(:mw_electricity) 959 K 959 K 0%
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 59.99 0 -100%
fixed_costs_per(:mwh_electricity) 16.72 0 -100%
cost_of_capital_per(:mwh_electricity) 5.61 0 -100%
depreciation_costs_per(:mwh_electricity) 8.64 0 -100%
variable_costs_per(:mwh_electricity) 43.27 NaN
fuel_costs_per(:mwh_electricity) 40.02 NaN
co2_emissions_costs_per(:mwh_electricity) 0.516 NaN
captured_biogenic_co2_costs_per(:mwh_electricity) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 2.47 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_electricity) 2.74 NaN
total_initial_investment_per(:mwh_electricity) 259.1 0 -100%
costs_per_mw_heat
total_costs_per(:mw_heat) 243 K 67,742.1 -72%
fixed_costs_per(:mw_heat) 67,742.1 67,742.1 0%
cost_of_capital_per(:mw_heat) 22,747.3 22,747.3 0%
depreciation_costs_per(:mw_heat) 34,995.9 34,995.9 0%
variable_costs_per(:mw_heat) 175 K 0 -100%
fuel_costs_per(:mw_heat) 162 K 0 -100%
co2_emissions_costs_per(:mw_heat) 2,089.2 0 -100%
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 9,998.8 9,998.8 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 11,098.9 0 -100%
total_initial_investment_per(:mw_heat) 1,050 K 1,050 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 65.7 0 -100%
fixed_costs_per(:mwh_heat) 18.31 0 -100%
cost_of_capital_per(:mwh_heat) 6.15 0 -100%
depreciation_costs_per(:mwh_heat) 9.46 0 -100%
variable_costs_per(:mwh_heat) 47.39 NaN
fuel_costs_per(:mwh_heat) 43.83 NaN
co2_emissions_costs_per(:mwh_heat) 0.565 NaN
captured_biogenic_co2_costs_per(:mwh_heat) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 2.7 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_heat) 3 NaN
total_initial_investment_per(:mwh_heat) 283.8 0 -100%