Present 1.52 B 1.52 B 1.52 B
Future 0 0 0
-100%
Edges 1.52 B Outputs
Node MJ Type
energy_power_hv_network_electricity 561.6 M Flexible
Reversed
37.0 %
48.0 %
Node MJ Type
energy_transmission_ht_steam_hot_water 227.68 M Flexible
Reversed
15.0 %
Inputs Edges 1.52 B
50.0 %
Type MJ Node
Share 758.92 M energy_distribution_coal
0.0 %
Type MJ Node
Share 0 energy_distribution_torrefied_biomass_pellets
50.0 %
Type MJ Node
Share 758.92 M energy_distribution_wood_pellets
Edges 0 Outputs
Node MJ Type
energy_power_hv_network_electricity 0 Flexible
Reversed
37.0 %
48.0 %
Node MJ Type
energy_transmission_ht_steam_hot_water 0 Flexible
Reversed
15.0 %
Inputs Edges 0
50.0 %
Type MJ Node
Share 0 energy_distribution_coal
0.0 %
Type MJ Node
Share 0 energy_distribution_torrefied_biomass_pellets
50.0 %
Type MJ Node
Share 0 energy_distribution_wood_pellets

Details

Sector energy
Use energetic
Heat network (HT)
group
self: electricity_output_curve
subtype
must_run
type
producer
Merit Order
level
hv
subtype
dispatchable
type
producer
Node groups
  1. preset_demand
  2. central_production
  3. electricity_production
  4. dispatchable_production
  5. heat_production
  6. hv_net_supply
  7. wacc_proven_tech
  8. primary_heat_infrastructure
  9. costs_production_chp_plants
  10. sankey_conversion_group
Used in Gqueries
  1. energy_chp_coal_ht_steam_hot_water_output_curve
  2. energy_chp_ultra_supercritical_cofiring_coal
  3. energy_chp_ultra_supercritical_cofiring_ht_coal_capacity_in_chp_properties
  4. energy_chp_ultra_supercritical_cofiring_ht_coal_electricity_production_in_chp_properties
  5. energy_chp_ultra_supercritical_cofiring_ht_coal_heat_production_in_chp_properties
  6. energy_chp_ultra_supercritical_cofiring_ht_coal_number_of_units_in_chp_properties
  7. factsheet_demand_of_biomass_other
  8. factsheet_supply_heat_from_rest_and_geothermal
  9. merit_order_coal_chp_pwd_cofiring_ht_availability_in_merit_order_table
  10. merit_order_coal_chp_pwd_cofiring_ht_capacity_in_merit_order_table
  11. merit_order_coal_chp_pwd_cofiring_ht_full_load_hours_in_merit_order_table
  12. merit_order_coal_chp_pwd_cofiring_ht_load_factor_in_merit_order_table
  13. merit_order_coal_chp_pwd_cofiring_ht_operating_costs_in_merit_order_table
  14. merit_order_coal_chp_pwd_cofiring_ht_position_in_merit_order_table
Used in Inputs
  1. capacity_of_energy_chp_ultra_supercritical_cofiring_coal
  2. efficiency_energy_chp_ultra_supercritical_cofiring_coal_electricity
  3. efficiency_energy_chp_ultra_supercritical_cofiring_coal_heat
  4. investment_costs_combustion_coal_plant
  5. om_costs_combustion_coal_plant
  6. share_of_energy_chp_ultra_supercritical_cofiring_ht_coal
  7. share_of_energy_chp_ultra_supercritical_cofiring_mt_coal
Method Label Present Future Unit
technical
electricity_output_capacity * number_of_units Installed electrical capacity 19.5 19.5 MW
electricity_output_conversion Electrical efficiency 37.0 37.0 %
heat_output_conversion Heat efficiency 15.0 15.0 %
full_load_hours Full load hours 8,000 0 hour / year
cost
total_investment_over_lifetime_per(:mw_electricity) Investment over lifetime per MW 2050041 2050041 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_electricity) Fixed operation and maintenance costs 48000 48000 EUR / MW / year
variable_operation_and_maintenance_costs_per_full_load_hour Variable operation and maintenance costs 1544 1544 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? true true boolean
other
technical_lifetime Technical lifetime 40 40 years
current_fuel_input_mix
coal_input_conversion Coal 50.0 50.0 %
torrefied_biomass_pellets_input_conversion Torrefied biomass pellets 0.0 0.0 %
wood_pellets_input_conversion Wood pellets 50.0 50.0 %
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 643.5 643.5 0% MWe
heat_output_capacity 260.9 260.9 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 4 4 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 8,000 0 -100%
households_supplied_per_unit - -
land_use_per_unit - -
takes_part_in_ets 1 1 0% yes=1 / no=0
technical_lifetime 40 40 0% year
typical_input_capacity 1,739.1 1,739.1 0% MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 1.32 B 1.32 B 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 30.89 M 30.89 M 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 1,544.4 1,544.4 0% euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs 40.89 40.89 0% euro / MWh
max_consumption_price 40.89 40.89 0% euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - 11
security_of_supply
availability 0.9 0.9 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value - -
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 1.52 B 0 -100%
preset_demand 1.52 B 1.52 B 0%
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.006 0.006 0%
weighted_carrier_co2_per_mj 0.047 0.047 0%
sustainability_share 0.5 0.5 0%
final_demand 0 0
primary_demand 1.52 B 0 -100%
primary_demand_of_fossil 758.92 M 0 -100%
primary_demand_of_sustainable 758.92 M 0 -100%
primary_demand_of_wood_pellets 758.92 M 0 -100%
primary_demand_of_coal 758.92 M 0 -100%
technical
input_capacity 1,739.1 1,739.1 0%
electric_based_input_capacity 1,739.1 1,739.1 0% MWinput
heat_based_input_capacity 1,739.1 1,739.1 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0.03 0.03 0%
costs_per_plant
total_costs_per(:plant) 383.73 M 92.89 M -75% euro / plant
fixed_costs_per(:plant) 92.89 M 92.89 M 0%
cost_of_capital_per(:plant) 29.02 M 29.02 M 0%
depreciation_costs_per(:plant) 32.98 M 32.98 M 0%
variable_costs_per(:plant) 290.84 M 0 -100%
fuel_costs_per(:plant) 275.72 M 0 -100%
co2_emissions_costs_per(:plant) 2,769 K 0 -100%
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 30.89 M 30.89 M 0%
variable_operation_and_maintenance_costs_per(:plant) 12.35 M 0 -100%
total_initial_investment_per(:plant) 1.32 B 1.32 B 0%
costs_per_node
total_costs_per(:node) 11.63 M 2,815 K -75%
fixed_costs_per(:node) 2,815 K 2,815 K 0%
cost_of_capital_per(:node) 879 K 879 K 0%
depreciation_costs_per(:node) 999 K 999 K 0%
variable_costs_per(:node) 8,814 K 0 -100%
fuel_costs_per(:node) 8,356 K 0 -100%
co2_emissions_costs_per(:node) 83,909.9 0 -100%
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 936 K 936 K 0%
variable_operation_and_maintenance_costs_per(:node) 374 K 0 -100%
total_initial_investment_per(:node) 39.98 M 39.98 M 0%
costs_per_mw_electricity
total_costs_per(:mw_electricity) 596 K 144 K -75%
fixed_costs_per(:mw_electricity) 144 K 144 K 0%
cost_of_capital_per(:mw_electricity) 45,100.9 45,100.9 0%
depreciation_costs_per(:mw_electricity) 51,251 51,251 0%
variable_costs_per(:mw_electricity) 452 K 0 -100%
fuel_costs_per(:mw_electricity) 428 K 0 -100%
co2_emissions_costs_per(:mw_electricity) 4,303.1 0 -100%
captured_biogenic_co2_costs_per(:mw_electricity) 0 0
fixed_operation_and_maintenance_costs_per(:mw_electricity) 48,001 48,001 0%
variable_operation_and_maintenance_costs_per(:mw_electricity) 19,200.4 0 -100%
total_initial_investment_per(:mw_electricity) 2,050 K 2,050 K 0%
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 74.54 0 -100%
fixed_costs_per(:mwh_electricity) 18.04 0 -100%
cost_of_capital_per(:mwh_electricity) 5.64 0 -100%
depreciation_costs_per(:mwh_electricity) 6.41 0 -100%
variable_costs_per(:mwh_electricity) 56.5 NaN
fuel_costs_per(:mwh_electricity) 53.56 NaN
co2_emissions_costs_per(:mwh_electricity) 0.538 NaN
captured_biogenic_co2_costs_per(:mwh_electricity) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 6 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_electricity) 2.4 NaN
total_initial_investment_per(:mwh_electricity) 256.3 0 -100%
costs_per_mw_heat
total_costs_per(:mw_heat) 1,471 K 356 K -75%
fixed_costs_per(:mw_heat) 356 K 356 K 0%
cost_of_capital_per(:mw_heat) 111 K 111 K 0%
depreciation_costs_per(:mw_heat) 126 K 126 K 0%
variable_costs_per(:mw_heat) 1,115 K 0 -100%
fuel_costs_per(:mw_heat) 1,057 K 0 -100%
co2_emissions_costs_per(:mw_heat) 10,614.2 0 -100%
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 118 K 118 K 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 47,360.9 0 -100%
total_initial_investment_per(:mw_heat) 5,057 K 5,057 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 183.9 0 -100%
fixed_costs_per(:mwh_heat) 44.51 0 -100%
cost_of_capital_per(:mwh_heat) 13.91 0 -100%
depreciation_costs_per(:mwh_heat) 15.8 0 -100%
variable_costs_per(:mwh_heat) 139.4 NaN
fuel_costs_per(:mwh_heat) 132.1 NaN
co2_emissions_costs_per(:mwh_heat) 1.33 NaN
captured_biogenic_co2_costs_per(:mwh_heat) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 14.8 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_heat) 5.92 NaN
total_initial_investment_per(:mwh_heat) 632.1 0 -100%