Present 0 0 0
Future 0 0 0
Edges 0 Outputs
Node MJ Type
energy_power_hv_network_electricity 0 Flexible
Reversed
40.0 %
45.0 %
Node MJ Type
energy_transmission_mt_steam_hot_water 0 Flexible
Reversed
15.0 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_distribution_coal
0.0 %
Type MJ Node
Share 0 energy_distribution_torrefied_biomass_pellets
Edges 0 Outputs
Node MJ Type
energy_power_hv_network_electricity 0 Flexible
Reversed
40.0 %
45.0 %
Node MJ Type
energy_transmission_mt_steam_hot_water 0 Flexible
Reversed
15.0 %
Inputs Edges 0
100.0 %
Type MJ Node
Share 0 energy_distribution_coal
0.0 %
Type MJ Node
Share 0 energy_distribution_torrefied_biomass_pellets

Details

Sector energy
Use energetic
Heat network (MT)
group
self: electricity_output_curve
subtype
must_run
type
producer
Merit Order
level
hv
subtype
dispatchable
type
producer
Node groups
  1. preset_demand
  2. central_production
  3. electricity_production
  4. dispatchable_production
  5. heat_production
  6. hv_net_supply
  7. wacc_proven_tech
  8. primary_heat_infrastructure
  9. costs_production_chp_plants
  10. sankey_conversion_group
Used in Gqueries
  1. energy_chp_coal_mt_steam_hot_water_output_curve
  2. energy_chp_ultra_supercritical_coal
  3. energy_chp_ultra_supercritical_mt_coal_capacity_in_chp_properties
  4. energy_chp_ultra_supercritical_mt_coal_electricity_production_in_chp_properties
  5. energy_chp_ultra_supercritical_mt_coal_heat_production_in_chp_properties
  6. energy_chp_ultra_supercritical_mt_coal_number_of_units_in_chp_properties
  7. factsheet_supply_heat_from_rest_and_geothermal
  8. merit_order_coal_chp_pwd_mt_availability_in_merit_order_table
  9. merit_order_coal_chp_pwd_mt_capacity_in_merit_order_table
  10. merit_order_coal_chp_pwd_mt_full_load_hours_in_merit_order_table
  11. merit_order_coal_chp_pwd_mt_load_factor_in_merit_order_table
  12. merit_order_coal_chp_pwd_mt_operating_costs_in_merit_order_table
  13. merit_order_coal_chp_pwd_mt_position_in_merit_order_table
Used in Inputs
  1. capacity_of_energy_chp_ultra_supercritical_coal
  2. efficiency_energy_chp_ultra_supercritical_coal_electricity
  3. efficiency_energy_chp_ultra_supercritical_coal_heat
  4. investment_costs_combustion_coal_plant
  5. om_costs_combustion_coal_plant
  6. share_of_energy_chp_ultra_supercritical_ht_coal
  7. share_of_energy_chp_ultra_supercritical_mt_coal
Method Label Present Future Unit
technical
electricity_output_capacity * number_of_units Installed electrical capacity 0 0 MW
electricity_output_conversion Electrical efficiency 40.0 40.0 %
heat_output_conversion Heat efficiency 15.0 15.0 %
full_load_hours Full load hours 8,000 0 hour / year
cost
total_investment_over_lifetime_per(:mw_electricity) Investment over lifetime per MW 1971008 1971008 EUR / MW
fixed_operation_and_maintenance_costs_per(:mw_electricity) Fixed operation and maintenance costs 53796 53796 EUR / MW / year
variable_operation_and_maintenance_costs_per_full_load_hour Variable operation and maintenance costs 1530 1530 EUR / full load hour
wacc Weighted average cost of capital 4.0 4.0 %
takes_part_in_ets Do emissions have to be paid through the ETS? true true boolean
other
technical_lifetime Technical lifetime 40 40 years
Node Attributes Present Future Change Unit
operational
electricity_output_capacity 600 600 0% MWe
heat_output_capacity 225 225 0% MWth
hydrogen_output_capacity 0 0 MW
free_co2_factor 0 0
ccs_capture_rate - -
construction_time 4 4 0%
electrical_efficiency_when_using_coal - -
electrical_efficiency_when_using_wood_pellets - -
full_load_hours 8,000 0 -100%
households_supplied_per_unit - -
land_use_per_unit 0.3 0.3 0%
takes_part_in_ets 1 1 0% yes=1 / no=0
technical_lifetime 40 40 0% year
typical_input_capacity 1,500 1,500 0% MWinput
output_capacity - - MW
input_efficiency - -
output_efficiency - -
cost
initial_investment 1.18 B 1.18 B 0% euro / unit
ccs_investment 0 0 euro / unit
cost_of_installing 0 0 euro / unit
decommissioning_costs 0 0 euro / unit
fixed_operation_and_maintenance_costs_per_year 32.28 M 32.28 M 0% euro / unit / year
variable_operation_and_maintenance_costs_per_full_load_hour 1,530.4 1,530.4 0% euro / full load hour
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour 0 0 euro / full load hour
fixed_costs_per_mw_input_capacity - - euro / MWinput
costs_per_mj - -
wacc 0.04 0.04 0%
profitability - profitable / unprofitable / conditionally_profitable
profit_per_mwh_electricity - - eur/MWh
marginal_costs 20.87 20.87 0% euro / MWh
max_consumption_price 20.87 20.87 0% euro / MWh
merit_order
merit_order_full_load_hours - -
merit_order_capacity_factor - -
merit_order_position - -
security_of_supply
availability 0.9 0.9 0%
part_load_operating_point - -
part_load_efficiency_penalty - -
forecasting_error - -
misc
demand_expected_value - -
excel_id - -
max_demand - -
Node Calculations Present Future Change Unit
demand
demand 0 0
preset_demand 0 0
demand_of_sustainable 0 0
weighted_carrier_cost_per_mj 0.003 0.003 0%
weighted_carrier_co2_per_mj 0.095 0.095 0%
sustainability_share 0 0
final_demand 0 0
primary_demand 0 0
primary_demand_of_fossil 0 0
primary_demand_of_sustainable 0 0
technical
input_capacity 1,500 1,500 0%
electric_based_input_capacity 1,500 1,500 0% MWinput
heat_based_input_capacity 1,500 1,500 0% MWinput
cooling_based_input_capacity - - MWinput
number_of_units 0 0
costs_per_plant
total_costs_per(:plant) 221.03 M 87.86 M -60% euro / plant
fixed_costs_per(:plant) 87.86 M 87.86 M 0%
cost_of_capital_per(:plant) 26.02 M 26.02 M 0%
depreciation_costs_per(:plant) 29.57 M 29.57 M 0%
variable_costs_per(:plant) 133.17 M 0 -100%
fuel_costs_per(:plant) 116.15 M 0 -100%
co2_emissions_costs_per(:plant) 4,776 K 0 -100%
captured_biogenic_co2_costs_per(:plant) 0 0
fixed_operation_and_maintenance_costs_per(:plant) 32.28 M 32.28 M 0%
variable_operation_and_maintenance_costs_per(:plant) 12.24 M 0 -100%
total_initial_investment_per(:plant) 1.18 B 1.18 B 0%
costs_per_node
total_costs_per(:node) 0 0
fixed_costs_per(:node) 0 0
cost_of_capital_per(:node) 0 0
depreciation_costs_per(:node) 0 0
variable_costs_per(:node) 0 0
fuel_costs_per(:node) 0 0
co2_emissions_costs_per(:node) 0 0
captured_biogenic_co2_costs_per(:node) 0 0
fixed_operation_and_maintenance_costs_per(:node) 0 0
variable_operation_and_maintenance_costs_per(:node) 0 0
total_initial_investment_per(:node) 0 0
costs_per_mw_electricity
total_costs_per(:mw_electricity) 368 K 146 K -60%
fixed_costs_per(:mw_electricity) 146 K 146 K 0%
cost_of_capital_per(:mw_electricity) 43,362.2 43,362.2 0%
depreciation_costs_per(:mw_electricity) 49,275.2 49,275.2 0%
variable_costs_per(:mw_electricity) 222 K 0 -100%
fuel_costs_per(:mw_electricity) 194 K 0 -100%
co2_emissions_costs_per(:mw_electricity) 7,960.7 0 -100%
captured_biogenic_co2_costs_per(:mw_electricity) 0 0
fixed_operation_and_maintenance_costs_per(:mw_electricity) 53,796.9 53,796.9 0%
variable_operation_and_maintenance_costs_per(:mw_electricity) 20,405.7 0 -100%
total_initial_investment_per(:mw_electricity) 1,971 K 1,971 K 0%
costs_per_mwh_electricity
total_costs_per(:mwh_electricity) 46.05 0 -100%
fixed_costs_per(:mwh_electricity) 18.3 0 -100%
cost_of_capital_per(:mwh_electricity) 5.42 0 -100%
depreciation_costs_per(:mwh_electricity) 6.16 0 -100%
variable_costs_per(:mwh_electricity) 27.74 NaN
fuel_costs_per(:mwh_electricity) 24.2 NaN
co2_emissions_costs_per(:mwh_electricity) 0.995 NaN
captured_biogenic_co2_costs_per(:mwh_electricity) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_electricity) 6.72 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_electricity) 2.55 NaN
total_initial_investment_per(:mwh_electricity) 246.4 0 -100%
costs_per_mw_heat
total_costs_per(:mw_heat) 982 K 390 K -60%
fixed_costs_per(:mw_heat) 390 K 390 K 0%
cost_of_capital_per(:mw_heat) 116 K 116 K 0%
depreciation_costs_per(:mw_heat) 131 K 131 K 0%
variable_costs_per(:mw_heat) 592 K 0 -100%
fuel_costs_per(:mw_heat) 516 K 0 -100%
co2_emissions_costs_per(:mw_heat) 21,228.5 0 -100%
captured_biogenic_co2_costs_per(:mw_heat) 0 0
fixed_operation_and_maintenance_costs_per(:mw_heat) 143 K 143 K 0%
variable_operation_and_maintenance_costs_per(:mw_heat) 54,415.3 0 -100%
total_initial_investment_per(:mw_heat) 5,256 K 5,256 K 0%
costs_per_mwh_heat
total_costs_per(:mwh_heat) 122.8 0 -100%
fixed_costs_per(:mwh_heat) 48.81 0 -100%
cost_of_capital_per(:mwh_heat) 14.45 0 -100%
depreciation_costs_per(:mwh_heat) 16.43 0 -100%
variable_costs_per(:mwh_heat) 73.99 NaN
fuel_costs_per(:mwh_heat) 64.53 NaN
co2_emissions_costs_per(:mwh_heat) 2.65 NaN
captured_biogenic_co2_costs_per(:mwh_heat) 0 NaN
fixed_operation_and_maintenance_costs_per(:mwh_heat) 17.93 0 -100%
variable_operation_and_maintenance_costs_per(:mwh_heat) 6.8 NaN
total_initial_investment_per(:mwh_heat) 657 0 -100%