energy_power_engine_network_gas
Present
0
0
0
Future
0
0
0
|
|
|
|
Details
Sector | energy |
Use | energetic |
Merit Order |
level
hv
subtype
dispatchable
type
producer
|
Network Gas |
profile
self: electricity_output_curve
type
consumer
|
Node groups |
|
Used in Gqueries |
|
Used in Inputs |
Node Summary
Method | Label | Present | Future | Unit |
---|---|---|---|---|
technical | ||||
electricity_output_capacity * number_of_units | Installed electrical capacity | 0 | 0 | MW |
electricity_output_conversion | Electrical efficiency | 48.0 | 48.0 | % |
full_load_hours | Full load hours | 1 | 0 | hour / year |
cost | ||||
total_investment_over_lifetime_per(:mw_electricity) | Investment over lifetime per MW | 650000 | 650000 | EUR / MW |
fixed_operation_and_maintenance_costs_per(:mw_electricity) | Fixed operation and maintenance costs | 6000 | 6000 | EUR / MW / year |
variable_operation_and_maintenance_costs_per_full_load_hour | Variable operation and maintenance costs | 800 | 800 | EUR / full load hour |
wacc | Weighted average cost of capital | 4.0 | 4.0 | % |
takes_part_in_ets | Do emissions have to be paid through the ETS? | true | true | boolean |
other | ||||
technical_lifetime | Technical lifetime | 25 | 25 | years |
All Attributes
Node Attributes | Present | Future | Change | Unit |
---|---|---|---|---|
operational | ||||
electricity_output_capacity | 400 | 400 | 0% | MWe |
heat_output_capacity | 0 | 0 | MWth | |
hydrogen_output_capacity | 0 | 0 | MW | |
free_co2_factor | 0 | 0 | ||
ccs_capture_rate | - | - | ||
construction_time | 1 | 1 | 0% | |
electrical_efficiency_when_using_coal | - | - | ||
electrical_efficiency_when_using_wood_pellets | - | - | ||
full_load_hours | 1 | 0 | -100% | |
households_supplied_per_unit | - | - | ||
land_use_per_unit | 0.1 | 0.1 | 0% | |
takes_part_in_ets | 1 | 1 | 0% | yes=1 / no=0 |
technical_lifetime | 25 | 25 | 0% | year |
typical_input_capacity | - | - | MWinput | |
output_capacity | - | - | MW | |
input_efficiency | - | - | ||
output_efficiency | - | - | ||
cost | ||||
initial_investment | 260 M | 260 M | 0% | euro / unit |
ccs_investment | 0 | 0 | euro / unit | |
cost_of_installing | 0 | 0 | euro / unit | |
decommissioning_costs | 0 | 0 | euro / unit | |
fixed_operation_and_maintenance_costs_per_year | 2,400 K | 2,400 K | 0% | euro / unit / year |
variable_operation_and_maintenance_costs_per_full_load_hour | 800 | 800 | 0% | euro / full load hour |
variable_operation_and_maintenance_costs_for_ccs_per_full_load_hour | 0 | 0 | euro / full load hour | |
fixed_costs_per_mw_input_capacity | - | - | euro / MWinput | |
costs_per_mj | - | - | ||
wacc | 0.04 | 0.04 | 0% | |
profitability | - | profitable / unprofitable / conditionally_profitable | ||
profit_per_mwh_electricity | - | - | eur/MWh | |
marginal_costs | 40.84 | 40.84 | 0% | euro / MWh |
max_consumption_price | 40.84 | 40.84 | 0% | euro / MWh |
merit_order | ||||
merit_order_full_load_hours | - | - | ||
merit_order_capacity_factor | - | - | ||
merit_order_position | - | - | ||
security_of_supply | ||||
availability | 0.95 | 0.95 | 0% | |
part_load_operating_point | 0.014 | 0.014 | 0% | |
part_load_efficiency_penalty | 0 | 0 | ||
forecasting_error | 0 | 0 | ||
misc | ||||
demand_expected_value | - | - | ||
excel_id | - | - | ||
max_demand | - | - |